The question

To ask the Scottish Executive what the cost of constructing a parallel link road between Middlebank and Inchture with the flyover under construction at the Inchture Junction of the A90 will be and whether the cost will be higher than the cost would be if the link road were constructed at the same time as the flyover is constructed.

The answer

Answered by Lewis Macdonald on 17 Jun 2002 · 20 days after it was lodged, 6 days after it was due

This situation did not arise as the additional statutory road and compulsory purchase orders required for a link road to Inchture are not in place.