Written Question · S1W-16244 · Session 1

On what days, at what times and how often Amey Highways Ltd is required to cut the grass verges of the A78 trunk road at Stevenston.

Answered Asked by Irene Oldfather Lab Lodged 12 Jun 2001

The question

To ask the Scottish Executive on what days, at what times and how often Amey Highways Ltd is required to cut the grass verges of the A78 trunk road at Stevenston.

The answer

Answered by Sarah Boyack on 26 Jun 2001 · 14 days after it was lodged, on time

The contract specification for cutting the grass verges of the A78 trunk road at Stevenston requires that, following the first cut in spring, the grass should be maintained at a height of between 50 mm to 70 mm during the growing season. It is normal for the first spring cut to take place in May or June although the precise timing of this work is a matter for Amey Highways Ltd.