Further to the answer to question S1W-3338 by Sarah Boyack on 18 January 2000, how many of the 20 confirmed sub-standard bridges have now b…

Answered Asked by Murray Tosh Con Lodged 22 Mar 2001

The question

To ask the Scottish Executive, further to the answer to question S1W-3338 by Sarah Boyack on 18 January 2000, how many of the 20 confirmed sub-standard bridges have now been brought up to standard or placed on a firm programme of works for upgrading; what the re-assessment of the remaining bridges has shown, and which of these bridges will be included in further upgrading programmes.

The answer

Answered by Sarah Boyack on 5 Apr 2001 · 14 days after it was lodged, on time

Four of the 20 bridges have been strengthened and 6 reassessed as adequate. With the exception of the A8 Orchard Farm Rail bridge, which has been strengthened by propping as an interim measure pending the outcome of further studies into the options for M8 Baillieston-Newhouse, the remainder have been included in the trunk road bridge strengthening programme.Of the other 53 bridges, 24 have been reassessed as adequate, 26 were confirmed as sub-standard, of which 7 have subsequently been strengthened. The reassessment of 3 structures is in progress.The following 25 bridges will therefore be strengthened in the programme:A76 Marchburn | A82 Achtriochtan | M8 Deans Road
A78 Inverkip Street Rail | A82 Achnambeithach | M8 Starlaw
A82 Allt Chonoglais | A82 Allt Fhiodhan | M8 Arkleston
A82 Ba | A87 Bunan | M8 White Cart
A82 Allt Molach | A87 Broadford | M8 St James Interchange (East)
A82 Creagdubh1 | A898 Erskine | M8 St James Interchange (West)
A82 Allt Nan Guibhas | A9 Kessock | M8 Black Cart
A82 Lairig Eilde | M74 Raith | M9 Hill Overbridge
A82 Altanrigh | | M9 River Avon
1Originally listed as adequate, further investigation resulted in this bridge being regraded as sub-standard. Not included in this list are 3 bridges which are to be bypassed by proposed trunk road schemes. These structures have been strengthened by propping as an interim measure pending their replacement.

In the Official Report

No contribution in the Official Report cites S1W-14376 by reference.