What the reasons are for the proposed alterations to the A78 trunk road at the junction with Beachway in Largs; whether the carriageway of …

Answered Asked by Kay Ullrich SNP Lodged 24 Jan 2001

The question

To ask the Scottish Executive what the reasons are for the proposed alterations to the A78 trunk road at the junction with Beachway in Largs; whether the carriageway of the A78 at this junction will be narrowed due to the extension of the pavement by around four feet; if so, whether this will result in further traffic congestion on the seafront at Largs due to Greenock-bound traffic being unable to pass vehicles attempting to turn into Beachway, whether there will be any consultation with Largs Community Council or local people before these alterations take place, and whether it will provide the results of any cost-benefit analysis carried out prior to the proposed alterations taking place.

The answer

Answered by Sarah Boyack on 7 Feb 2001 · 14 days after it was lodged, on time

The works at the A78 junction with the Beachway, Largs are part of an Accident Investigation and Prevention scheme to improve pedestrian safety at the junction. The width of road to be crossed by pedestrians will be reduced at this location and will force drivers to take more care when negotiating the junction.The effects of this scheme may result in slight delays on the trunk road. However, this is considered acceptable in view of the increased safety to pedestrians. There is no requirement to undertake public consultation with regard to these minor improvement works which are considered necessary to reduce the number of accidents on the A78.The scale of the costs involved in the improvement scheme is small in comparison with the cost savings associated with improved road safety.

In the Official Report

No contribution in the Official Report cites S1W-12766 by reference.