Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
Last year we pledged that we would announce the next part of our school building programme to take forward major new capital investment in schools through the Scottish Futures Trust. I can make that announcement today.
It is the right of every pupil to be educated in a good-quality school that is fit for purpose. I can report that this Government is providing funding that has already helped to lift 50,000 pupils out of poor-quality buildings and that council school building programmes are on track to lift another 50,000 out of poor-quality school buildings by 2011. [Applause.]
With our local government partners we are addressing the legacy of underinvestment during the 1970s, 1980s and 1990s, when schools were being replaced at an unsustainably low rate. The previous Administration addressed the situation by supporting the new build or refurbishment of around 320 schools in the first eight years of devolution. The current Administration is providing financial support for 250 new or refurbished schools in the current four-year session. [Applause.]
Today, I can announce our next steps towards improving school buildings. In addition to the capital funding that goes to local authorities to support school buildings, the next phase in our drive to improve Scotland's school buildings will be a new, £1.25 billion national programme to build new schools across Scotland, delivered in partnership with the Convention of Scottish Local Authorities and local authorities through the Scottish Futures Trust. [Applause.]
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
The new school building programme will be managed and supported by the SFT, with work beginning as early as next year.
In addition to the record funding already set out in the local government settlement, the Scottish Government will provide almost two thirds of the overall funding support, or £800 million, towards this £1.25 billion school building programme. Government funding will initially be provided as direct capital grants, but comparable revenue funding to support off-balance-sheet schemes to the same value will be an option where appropriate.
We said that we would match the previous Administration's school building programme brick for brick and we are doing that—and more.
Under its partnership agreement, the previous Administration promised to renew 100 schools between the end of 2006 and 2009. Not only have we matched those commitments, but we have already exceeded them. Councils have completed well over 150 school rebuilding or refurbishment projects since May 2007. With this Scottish National Party Government supporting £2 billion of capital investment in schools alone, at least 250 new or refurbished schools will be delivered by 2011.
Now we will go even further. Our new £1.25 billion school building programme will support authorities in building around 55 new schools—approximately half of which will be secondaries and half primaries. That will see up to 35,000 pupils benefiting from being educated in brand new, state-of-the-art classrooms.
Let me be clear: this new building programme will be in addition to the capital allocation that will be made to councils as part of the normal annual budgetary process, with those new resources adding to the maintenance of local authorities' share of the overall capital budget. That is what COSLA and the councils have been asking for: additional funding to support the school building programme. That is what we are responding to and delivering.
All told, the investment will also boost economic activity by continuing to support tens of thousands of construction jobs across the country, helping families and communities and contributing to economic recovery.
The school building programme will be taken forward in partnership with COSLA and councils. The concordat already commits the Government and COSLA to doing what is required to enhance learning experiences for children and young people by improving the fabric of schools and nurseries.
In partnership with COSLA, we accepted all the recommendations of Audit Scotland's March 2008 report, "Improving the school estate". We have also worked closely with the Association of Directors of Education in Scotland, the Society of Local Authority Chief Executives and Senior Managers and the Scottish Futures Trust, on a new school estate strategy.
On our taking office in 2007, there were around 260,000 pupils in poor classroom accommodation—category C or D schools. By 2011, that figure should be down to around 100,000. I pay tribute to the focus of councils and to their investment decisions that will help to achieve that. With today's announcement, the figure will then drop by another third to around 65,000. When we publish the new school estate strategy jointly with COSLA in September, we will be setting out a long-term ambition to wipe out poor school accommodation altogether.
Since May 2007, this Government has signed off eight local authority public-private partnership/non-profit-distributing projects involving 49 schools and we have substantially increased the overall capital resources available to authorities. Funding the full programme of 30 such projects means that this Government is having to find around £60 million more per annum than was included in the funding baselines inherited from the previous Administration. We honoured those payments to ensure that all the schools in the pipeline went ahead. Such behaviour is the hallmark of the Government. We said that we would match the previous Administration's commitments brick for brick and we have done so.
We have gone further. In total, local authority capital funding will amount to £2 billion over the two-year period from 2008 to 2010. In 2008-09, that represents £82 million, which is 9.5 per cent more than in 2007-08, and the 2009-10 figure is £99 million, which is 10.5 per cent higher than that in 2008-09.
I am pleased that schools and communities throughout the country are already benefiting from accelerated capital investment in education of about £75 million. That investment was brought forward as the result of an agreement with COSLA that councils could accelerate capital expenditure from 2010-11 to this year. For example, South Lanarkshire Council has advanced the building of the new Udston primary, which will open a whole year earlier; North Lanarkshire Council has accelerated the construction of three schools and a nursery; and East Renfrewshire Council will commence the replacement of Isobel Mair school early.
Today, we set out the Government's long-term commitment to the school building programme. The new £1.25 billion school building programme will be similar in scale and impact to the Government's other major capital projects—the Forth replacement crossing and the new Southern general hospital in Glasgow. As with those projects, we are making a clear and unambiguous statement about our future intent: our absolute long-term commitment to work with our local government partners in the interests of all those who benefit from good-quality schools—particularly children, young people and communities.
A new secondary school can cost anything from £20 million to more than £40 million. That represents the single biggest capital investment that some councils ever make. I am mindful of the number of primary schools that are needed but, as their cost is roughly a quarter of that of secondary schools, they present rather less of an affordability challenge for councils. The bulk—almost 90 per cent—of our new funding will therefore be focused on supporting the construction costs of new secondary schools. We will provide two thirds of the costs of new secondary schools and authorities will require to fund one third. We will support the primary school element of the programme on a 50:50 basis, so authorities will be able to fund two primaries at the cost of just one.
The new funding will bring the costs to authorities of replacing the secondary schools that most urgently need to be replaced down to more manageable proportions. It will also help them to accelerate further their primary school replacement programmes. I am conscious that the needs of secondary schools that require urgent replacement—from Lasswade high school in the Lothians to Wick high school in the north, Dumbarton academy in the west and others in between—have been raised often in Parliament. After discussions with COSLA and the SFT, I will be in a position to announce in September which authorities will benefit from the first tranche of secondary schools and to announce by the end of the year those that will benefit from the first tranche of primary schools. Councils will of course decide which schools to replace, but our intention is that councils with the most urgent needs—on the basis of the regularly collected national statistics—should benefit first.
We expect the first phase to be funded through direct capital investment, to allow construction to start on the buildings that most require attention as soon as possible. Through the SFT, different funding models—including the non-profit-distributing model—will be an option for later phases. We are asking the Scottish Futures Trust to provide advice on that. We and the SFT will also discuss funding options with COSLA and the authorities.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
One key feature of maximising value from the programme will be encouraging the fullest co-operation between all the partners: COSLA, the councils, the SFT and the Scottish Government. Angus Council, East Renfrewshire Council and Midlothian Council are in the vanguard of that, as they have come together to share best practice and to design a common approach to the school building programme with the SFT. That proves how we can deliver more value from the investment. I thank those three local authorities for participating with such commitment in the development of the model that we are taking forward. Their work will underpin the first announcements that we will make in September.
We have made it clear that we have set up the Scottish Futures Trust to maximise value for money from infrastructure investment and to act as a focal point for developing and applying good practice in procuring public infrastructure. The SFT will, therefore, play a central role in co-ordinating, facilitating and managing the new school building programme, working alongside COSLA and councils, whose detailed local knowledge and expertise will be crucial to achieving successful outcomes. We will look to the SFT to develop, recommend and implement approaches that will secure a better school building programme across Scotland and better value for money than could be achieved by each authority working separately. That is precisely what the SFT was set up to do.
Under the Government's Scottish Futures Trust, we will work with COSLA and local authorities to ensure that every pound spent delivers as much public benefit as possible in Scotland as a whole. Instead of each local authority having to reinvent the wheel—instead of duplicating design and other costs—the SFT will enable us to deliver more for less. Because it is involved, we will deliver more schools for taxpayers' money.
The Government has already supported local authorities in delivering more than 150 school building projects. By 2011, the figure will stand at 250. Now we are going further. The new school building programme, with the significant input of Government funding that I have announced, will come on stream next year. The first bricks could be laid in more new schools in communities up and down the land. All of that will be over and above the capital investment that will arm councils with the funding that they need to take forward their own school building programmes.
Working with COSLA and local authorities, we can deliver better school accommodation the length and breadth of Scotland and take the next steps towards ensuring that Scotland's children are taught in quality classrooms, providing a 21st century environment in which improved learning and teaching, through the curriculum for excellence, can equip them not just to survive but to thrive in 21st century society.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I do not think that a £1.25 billion school building programme is "woefully thin". I do not think that a £2 billion investment in school building—under the current Administration—is "woefully thin".
I have in front of me a letter about West Lothian schools from Mary Mulligan that was sent out to voters during the 2007 election campaign. She said:
"The SNP have committed to scrapping plans for the new Armadale Academy and all future investment in West Lothian's school buildings."
I was indeed at St Kentigern's academy this morning, and I saw the refurbishment there—that was not scrapped. I also note the go-ahead by the local council, in January and March 2008, for £59 million of investment in schools in West Lothian. Furthermore, Armadale academy is being built by an SNP council in West Lothian, supported by funding from an SNP Scottish Administration. Dare I say, perhaps the interests of the pupils of Lasswade would be best served if the constituency member approached the local authority to take part in this wonderful opportunity to take forward a £1.25 billion school building programme.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I remind the member that the current £2 billion-worth of investment is not just achieving a better working and learning environment for our young people, but supporting the construction industry. It is important to reflect that, even according to today's figures for the year to March 2009, employment in the construction industry in Scotland rose by 1.4 per cent. Clearly, the construction industry is under some pressure, particularly in private house building, so not only investment in schools, but the Government's investment of £2 billion to local government over the period from 2008 to 2010 alone is providing support for capital infrastructure. It has been vital to keep that investment going, and that is why I refer to the accelerated investment, with £75 million brought forward to support construction jobs.
The SFT most certainly will provide better value for money. Judging from the references that have been made, some of the provisions that were made by previous Administrations were woeful. Labour is now in a minority of one that thinks that PPP and the private finance initiative deliver best value for money. In fact, we need only consider the fiasco in England to see the reality of PFI. Far from the risk being transferred from the public sector to the private sector, the Treasury is having to bail out PFI schemes to the tune of £2 billion this year alone.
The involvement of the SFT in managing and facilitating the programme, and bringing together different local authorities, will provide better value for money. That will ensure that the lessons are learned across the country. Today, we should be celebrating the opportunity for young people to work in the 21st century schools that they deserve. The Administration has made progress; today, we are announcing our next steps.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
We must reflect on Audit Scotland's report, "Improving the school estate", which was published in March 2008. We accepted all the recommendations in the report. It was clear that Audit Scotland thought that we must take a long-term, strategic view of school building projects in Scotland.
As I said, the Government is supporting local authorities with £2 billion of capital investment. £1 billion is coming through support from national schemes and an additional £1 billion will come through the capital programme, which is supported by the Government. The £100 million from the schools fund has been put into local Government settlement. On top of that, we had to find another £60 million a year, to make up a shortfall on bills that the previous Administration had not paid.
We have taken our responsibilities seriously. Not only have we marshalled projects that were in the pipeline during the previous Administration, and not only have we ensured that there are sufficient resources to build 250 schools during the current Administration, but we have ensured that we have plans for the future, so that there is a pipeline of school projects, to secure the jobs that Murdo Fraser talked about. We have kept up the momentum. We are still building schools.
On timeframes, it is proposed that councils that have the most urgent needs will be dealt with first. We expect the first primary school to be open by 2011 and the first secondary school to be open by 2013.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
We will include in the programme authorities that have been identified by the national assessment as being in most need. In particular, the categories—members will be familiar with the categories of schools—will help to direct our answers.
Local authorities that have been in the vanguard of considering how the SFT can add value might want to ensure that they are included in the programme. It is important to remember that the SFT is already supporting a number of local authority school building programmes.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
We respect local government. It will be for councils themselves to determine which schools will be in the programme, but we will decide which local authorities will be in the first tranche. With respect, I say to Ken Macintosh that pupils and parents do not care about the timescales for elections; they want new schools to be built. [Interruption.]
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
The investment that we are providing to local government is already producing new schools. I mentioned Isobel Mair school in East Renfrewshire; the building for that has been brought forward from 2010-11 because we have managed to accelerate capital.
We do not micromanage local government, so local authorities will determine which schools go forward for the programme. We have provided the funding for that programme to progress. Perhaps, instead of focusing his attention on the Government, Ken Macintosh could approach East Renfrewshire Council to find out its timescale for deciding what schools, if any, it wants to propose to take part in the £1.25 billion school building programme.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
Christina McKelvie raises an important point about the design of schools. We will work with Architecture and Design Scotland, the Carbon Trust and others to ensure not only that the designs are appropriate for modern-day learning in a 21st century environment but that they are energy efficient, which is essential to ensure that they contribute to the climate change challenges that lie ahead.
It is appropriate and important to involve the pupils themselves in the design to ensure that we get quality results. I have visited and, indeed, opened a number of schools that have been started since this Administration came to power. The architecture that could be delivered by listening to the pupils and teachers in those schools delivers results. I expect the SFT to draw on that talent, experience and expertise.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
The initial funding will be by direct capital. We will examine other not-for-profit processes in future to get value out of the system, but direct capital investment is the quickest way to ensure that we get the investment that we need.
I heard Andy Kerr say sorry. I am not sure whether that was the first time that I have heard him say that or whether it will be the last time that I hear it, but he might want to say sorry to the taxpayers for Hairmyres PFI hospital. Evidence to the Finance Committee revealed that an investment of only £8.4 million by financiers is projected to provide a return of £145 million. We do not have to look far to see the flaws of the PFI model. Perhaps the taxpayers of Scotland would prefer not to go shopping with Mr Kerr any more but to look to this Government to implement responsible and prudent financial arrangements for school building programmes.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
Elizabeth Smith raises an important point. I talked about the category C or D schools about which we have concerns. There have been concerns about the surveys and pieces of research that have been undertaken to establish those categories. Indeed, local authorities have re-examined many of them over the past two years.
I do not particularly want to name any schools because I do not want to prejudge what the councils themselves will determine once we have determined which authorities have the secondary and primary schools that are most in need. However, there is currently only one category D secondary school in Scotland—Lasswade high school centre. I have visited that school, so I realise the need that exists there. I hope that Midlothian Council will have the opportunity to make an application in that case, but I do not want to prejudge a matter that is for the council.
I hope that I have given the member some idea of how we will ensure that the schools that are most in need and that have an impact on the greatest number of children—some 35,000 in total—can benefit from the programme.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
The funding will start from 2010-11 and continue to 2017-18. The first schools to be built will be primary schools in 2011, and secondary schools will be built in 2013. That is on top of the 250 schools that will be built by 2011.
Yes, we have been in discussion with COSLA. I point out that, funnily enough, the £800 million that we propose to invest in the schools building programme equates to the £800 million in cuts that the Lib Dems proposed for the Scottish budget. Therefore, perhaps local authorities will have less difficulty in finding the £450 million to support the programme, given that they are finding £1 billion in the current local government settlement.
Margaret Smith might want to reflect on the situation over the piece: 320 schools were built in the first eight years of the previous Administration; 250 schools will be built over the first four years of this Administration and, going forward, an additional number of schools will be built to replace the worst school buildings that need the most attention. That is the provision that we are making through our £1.25 billion school building programme.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
Quite clearly, capital investment for local authorities is already supporting such capital projects. As I said when asked earlier about the schools fund, the local government settlement includes provision to ensure that the £2 billion of capital infrastructure for 2008 to 2010 helps to support any capital investment that is required to support class size reduction. That money will certainly support local authorities. In planning for the primary estate, which accounts for 50 per cent of the schools affected, schools will be designed with a view to ensuring that the classrooms can facilitate smaller class sizes, particularly in the early years.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I remind the member that closure decisions are for local authorities. If she is astounded that any council would move pupils out of one category to conditions that are worse than those in the previous school, she should perhaps reflect on whether that shows the priority—or lack of priority—that Glasgow City Council places on its education budget.
Why is it that in neighbouring authority areas such as North Lanarkshire and South Lanarkshire we have large-scale investment in schools that is funded and supported by this Government, not—as Andy Kerr claims—through PPP? Given that that is the case, why does Glasgow City Council say that it has only £5 million available for school building projects? At the end of the day, politics is about priorities. This SNP Government is supporting schools and school education. If the member wants to pursue the lack of priority that Labour-run Glasgow City Council attaches to education, she is in the wrong chamber.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I can confirm that the money that I have announced will be additional to the local government settlement. It is important to repeat that this Government has set out three major capital infrastructure projects, which represent a strategic investment in our future: the Forth replacement crossing, the Glasgow Southern general hospital and the school estate programme. In doing so, it has provided a vision and a strategy, which the Audit Scotland report that was published in March last year called for. Local authorities across the country might want to reflect maturely not only on the use of money that has already been provided but on the proposals and promises that have been made about taking funding forward.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
My understanding is that West Dunbartonshire Council has recently had meetings with local parents about where the new Dumbarton academy will be sited. I also understand that the council has had initial discussions with the SFT. I am not in a position to make decisions for the council, but I have every confidence that it will make the right decisions for pupils in its area.
If the member wants to trade numbers on delivery in the school estate, I can tell her that the rates of progress show that 0.76 schools a week were delivered in the first eight years of devolution, whereas 1.2 schools a week have been delivered during the present four years of devolution. [Interruption.]
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
Can Opposition members not acknowledge that it is about time that we stopped trading statistics on school buildings on a ping-pong basis, year in, year out? We must start to treat the improvement of our school estate as a major infrastructure project for this country. As stewards of this Parliament's funding, we have a responsibility to ensure that we make not just decisions for this year or the year after but strategic decisions. I have made a major infrastructure announcement, and I hope that members will treat it as such.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I can confirm that our initial proposals are for direct capital funding, but over the piece we will be able to take forward other methods of funding, including the non-profit-distributing method in particular. Issues such as what is off balance sheet can be developed as we move forward.
The member will be aware that the advice and guidance from the Treasury on how major infrastructure programmes could be dealt with, given the change to international financial reporting standards accounting by the end of March, came through only on 28 April, which is very late indeed. However, there is no delay in any proposal, which is why we can confirm that we will support the first tranche of schools using a direct capital funding method.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I am delighted that City of Edinburgh Council is taking forward its proposals for Portobello school. If the member describes £1.25 billion as cuts, she and I must live in parallel universes. If we are talking about priorities for Edinburgh, perhaps Sarah Boyack and other members might reflect on the fact that the £500 million spent on tram works would have built those schools. Politics is about choices, and we are putting our commitment to education first.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
It is important that we reflect on how we are managing to reduce in particular the number of secondary pupils in poor accommodation—I know that the member has an interest in that in his constituency. Fifty new schools, half of which will be secondaries, is a major improvement. The member will know the experience of Aberdeenshire Council—perhaps there have been long years of neglect. Many local authorities have refurbished all their secondaries. I visited St Kentigern's academy, which will be part of West Lothian's completion of all its secondaries. Some of the responsibility lies with the progress—or lack of it—by Aberdeenshire Council in recent years. Again, that comes down to political choices.
We are providing the opportunity. A number of schools in Aberdeenshire need support, and I anticipate—although I cannot predict—that some of those schools will be part of the first tranche.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I invite Glasgow City Council to engage with the Government, COSLA and the SFT to identify whether any of the council's proposals are going forward. I repeat that the previous Administration delivered 0.76 schools a week; under this Administration, it is 1.2 schools a week.
Perhaps Margaret Curran is not aware that we are in a recession. Public finances from the Westminster Government look extremely worrying for all concerned. In the days when Margaret Curran was a minister, the allocation under devolution far exceeded anything that we have now or might anticipate in future. The fact that the Government is prepared to put on the table investment for the future in those difficult circumstances shows the importance that we give to education. In such tight financial circumstances, I would have thought that members of all parties would welcome today's announcement.
Fiona Hyslop
SNP The Cabinet Secretary for Education and Lifelong Learning · Lothians
link
I said that the schools estate strategy would be published in September; at the moment, it is nearing its final draft. It is not unreasonable for local government partners to want to identify the financial support that we are prepared to provide for taking the strategy forward. Had the member read the Audit Scotland report, she would know that that is exactly what the report recommended—and we have accepted all 19 of its recommendations.
Perhaps the member can accept that today's announcement of £1.25 billion for the school building programme is good news for Scotland.