Parliament Workbench
Data: Official Report to 19 Nov 2026

Official Report · Committee

Railways Bill

Tuesday 18 January 2005 Local Government and Transport Committee Bill scrutiny 727 contributions · 24 speakers

Speakers

Choose an MSP to read only their contributions

The record

727 contributions · showing 1–200
Bristow Muldoon Lab The Convener · Livingston
link

I open the public section of today's meeting of the Local Government and Transport Committee. Committee members have had an initial discussion of some of the issues that we will debate today. In particular, we have considered a Scottish Executive paper on the financial arrangements for the United Kingdom Railways Bill.To some degree, it is unfortunate that we received the information at a late stage because that makes scrutiny and discussion of some of the information more difficult. However, I have requested that if any of the witnesses who are giving evidence to the committee this afternoon has not seen the information in advance, they should be able at least to see the documents so that they are able to respond to the proposals. The situation is not ideal, but I understand that it is the result of on-going and extensive discussions between the UK Government and the Scottish Executive. The financial arrangements are now available.I apologise to any of the witnesses that we held up while we were meeting in private; we wanted to discuss the meaning of the figures before we brought the first group of witnesses into the room.Fergus Ewing wants to comment on his concerns about the matter.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

Although we raised the issue of principle with the minister on 2 November 2004—in columns 1317 to 1318 of the Official Report—and in particular the criteria that will be used to allocate financial responsibility, whether it be Barnett, population, audit of need or estimation of value of the network, we received no information until after today's meeting started. We have only just received the figures and none of them has an explanation. That makes our scrutiny role almost impossible. Perhaps the figures should have been submitted to the Finance Committee for its normal scrutiny of important matters pertaining to the future responsibilities of the Scottish Executive and Scottish Parliament. This is no criticism of the gentlemen who are present just now but, so far, the procedure has been nothing short of shambolic. Obviously we will play our part today and try to improve things as we go along.

Bristow Muldoon Lab The Convener · Livingston
link

Thank you for explaining your view on the matter. It is now important that the committee focuses on the UK Railways Bill, the devolved powers that it gives, and whether the resources that have been proposed as a result of agreements between the UK Government and the Scottish Executive will be sufficient to allow the Executive to have the impact on Scotland's railways that it aspires to have.With that in mind, I welcome the first group of witnesses, who are representatives from the Office of Rail Regulation: Tim Martin is the director of infrastructure and economic regulation; John Thomas is the deputy director of economic regulation; and Paul McMahon is the head of regulatory economics.Gentlemen, it would be useful if, when you make your introductory remarks, you could indicate the degree to which the ORR has been involved in the discussions that have taken place on the financial arrangements associated with the UK Railways Bill, and give any comments on the paper that the Scottish Executive has made available to the committee—I believe that you have had sight of it. I invite Tim Martin to make his introductory remarks on behalf of the ORR.

Tim Martin Office of Rail Regulation
link

Thank you for inviting us to give evidence to the committee. We are pleased to be here. I hope that we will be able to answer all the committee's questions, but if there is anything outstanding at the end, or any issue on which the committee is not clear from what we have said, we can send a note on it.I did not intend to make any long introductory remarks, but I will pick up on your request for comments on the Executive's paper, which, as you pointed out, we have all just seen. I should say that the way in which devolution is to take place has been under discussion since before the white paper was issued. Since then, there have been extensive discussions. The ORR is not party to the arrangements between the two Governments, but we have been following the methodology and, broadly speaking, we agree with the way in which it has been done. Basically, there are two elements: the costs that are expected to be incurred in Scotland in accordance with the regulatory settlement and Network Rail's projections; and separation of the regulatory asset base. On the latter element, we have said that we intend to consult in the near future, because it is important to ensure that regulatory principles are established so that, should there be further devolution to other Governments, we will have a set of principles to follow. Obviously, quite large sums are involved.John Thomas might like to add to that.

John Thomas Office of Rail Regulation
link

I will add a bit more detail to what Tim Martin has said. As the committee knows, the Scottish Executive recruited Ernst & Young to do an assessment of the forward-looking costs and a split of the regulatory asset base. The ORR has provided comments throughout that piece of work. There are some straightforward elements that can easily be identified at a Scottish level—for instance, Network Rail's forward-looking maintenance and renewal costs—but clearly there are also some costs that are common to the network as a whole, such as overheads, and it is necessary to find an appropriate allocation metric for those costs. We have provided comments that we believe have been taken on board in the final settlement, although, like the committee, we have not seen the detail of the calculations for the settlement. As long as our comments have been taken on board, the 10 per cent RAB allocation looks broadly sensible. There are a number of ways in which to allocate the regulatory asset base and there is no right answer. We will consult on the issue, but there are no great concerns that the figure is in the wrong ballpark.

Tim Martin Office of Rail Regulation
link

The other thing that we might comment on now is the ring fencing that is referred to in the Executive's paper. I ask Paul McMahon to explain from a regulatory point of view the options on which we will consult.

Paul McMahon Office of Rail Regulation
link

The ring fencing relates to the regulatory regime under the new arrangements, once they have commenced, about which there is some debate. Different parties—in particular, the Government in London and the Executive in Edinburgh—are funding Network Rail and want to ensure that the moneys that they provide to fund outputs are retained for the benefit of the networks in the respective countries. Therefore, the issue of ring fencing arises. To what extent could or should we ring fence money within different time periods?An extreme ring-fencing option could be sought, and money that is put into the network from either London or Edinburgh could be retained on an annual basis. If, for example, Network Rail was overspending in England and Wales, it could, in effect, draw on funding that it had received in Scotland—to the extent that Scotland was outperforming the regulatory expectations. In effect, Network Rail could borrow money from Scotland and use it to fund the achievement of outputs south of the border. Equally, the opposite could apply. Moneys could be ring fenced on an annual basis and if there was outperformance in a region—in Scotland, for example—moneys could be either returned to funders, used to fund additional outputs or used for a number of other uses. That approach could be said to be quite strict and perhaps too extreme in constraining Network Rail's flexibility to run its business over the five-year control period in which we regulate Network Rail and specify its outputs, costs and revenues. The next option would be to say that ring fencing was appropriate, but over the five-year control period. Within the five years, Network Rail could manage its expenditure and outputs to achieve its regulatory outputs in both Scotland and England by shifting money from Scotland to England and vice versa. The intention would be to have a balance in the accounts at the end of the five-year period and no carryover into the next control period.Other options include extending the ring-fencing option into future control periods. However, that raises issues to do with risks. Clearly there is a risk that funders—whether from Scotland or England—would not see their money over the medium term. We seem to be coalescing around the option of a five-year period for ring fencing, but we will discuss the matter with all the parties in more detail. The issue will be central to our consultation.

Tim Martin Office of Rail Regulation
link

That covers the main financial issues in the statement from our point of view. If members want to ask about other issues, they should go ahead.

Bristow Muldoon Lab The Convener · Livingston
link

Thank you. Those introductory remarks are useful. I will start off with a couple of questions before I bring in colleagues.John Thomas described the broad 10 per cent regulatory asset base allocation to Scotland as being reasonable. I note that the ORR will have a role in auditing or verifying that settlement. How long do you expect that it will take for you to carry out the work and give information to both Governments about the final share? Do you have a feel for the potential for the final figure to vary from the broad 10 per cent figure that is proposed in the Executive document?

Tim Martin Office of Rail Regulation
link

We plan to consult on timing in the next couple of months—I mean towards the end of this financial year—which would accord with the due diligence work that we will be doing. That is the broad timetable. We will be able to confirm our view after the consultation. I note that the settlement is due to come into effect on 1 April 2006, so our work will be well in advance of that date.

John Thomas Office of Rail Regulation
link

What happens is subject to whether we go for a six-week or a three-month consultation period. If we went for a six-week consultation period, I do not see any reason why we could not consult on the matter by this summer, which is well in advance of a year next April.

Tim Martin Office of Rail Regulation
link

Perhaps Paul McMahon would like to talk about the range.

Paul McMahon Office of Rail Regulation
link

There has been much discussion about the range of values from a financial or economic perspective. We are interested in ensuring that, as far as possible, the final value reflects asset values on the network in Scotland, so we have considered a range of indicators, or values, including track kilometres, vehicle mileage and so on. Most of them are between 9 and 10 per cent—9.5 or 9.7 per cent are the sort of values that come up most frequently in discussions. Quite conveniently, those figures come in the central point of a range between about 6.5 or 7 per cent and 13 or 13.5 per cent, which is where the boundaries are, although those figures are quite extreme. That is why Tim Martin and John Thomas have indicated that we are fairly comfortable at this point with a 10 per cent value. That is expected to be very close to the final outcome that we might reach, but we need to consult on that, of course. As a rule of thumb, one percentage point of difference in the share of the RAB is equivalent to around £15 million to £20 million on the bottom line in the funding settlement.

Bristow Muldoon Lab The Convener · Livingston
link

A lot of concern has been expressed in recent years about the way in which the cost base of railway investment and maintenance has escalated in the period following privatisation. I am aware that the ORR, in both its current and previous guises, required Network Rail to bear down on costs quite extensively. To what extent is it possible to apply a different cost base to Network Rail in Scotland, as opposed to in the United Kingdom as a whole, as a result of both the different nature of the rail networks in Scotland and in the rest of the UK and other potential cost pressures associated with the various economic pressures in different parts of the UK?

Tim Martin Office of Rail Regulation
link

The different costs of the network in Scotland compared with those in the UK as a whole are reflected in the projected figures. In the current control period, the efficiency objectives will be the same for Scotland as for the rest of the UK. The regulatory system will apply in the same way. The costs going forward will be determined to a large extent by what Scottish ministers require of the system in Scotland compared with what the Secretary of State for Transport requires in England and Wales. As in the white paper and reflected in the Railways Bill, the objective is for there to be a much more direct relationship between Governments and the amount that Network Rail spends and how it does so. As part of the charges review, which will establish how much Network Rail will receive and spend in the next control period, there will be a big role for Scottish ministers in determining the shape of the network that they want and the sort of services, capability and performance that will be required. That will be a key driver of how much is spent and how much budget the Executive is prepared to make available.

John Thomas Office of Rail Regulation
link

As far as the cost base or the underlying unit costs of the network are concerned, the access charges review that was completed in December 2003 was carried out on the basis of network-wide assumptions about efficiency and by estimating the forward-looking costs of the Scottish network compared with the costs of the English and Welsh network. We will have to make assumptions about the future efficiency requirements of Network Rail in both Scotland and England and Wales. You will not be surprised to hear me say that, at this moment in time, it is very difficult for us to say whether there will be a big difference between Network Rail's ability to achieve efficiencies in Scotland and its ability to do so in England and Wales. We will need to consider that at the next access charges review.

Tim Martin Office of Rail Regulation
link

In the previous access charges review, we did an extensive joint exercise with Network Rail to benchmark the costs of key operations between different parts of its business. The amount of further efficiency to be got out of the business depends on how efficient Network Rail is in Scotland now. Obviously there is further to go on efficiency savings where there has been a lot of inefficiency, such as on the west coast main line.

Bristow Muldoon Lab The Convener · Livingston
link

I have a final question before I let in colleagues. There is a perception that since Network Rail was formed, there has been a move towards centralisation of some of its functions. To what extent might that affect the ability of the ORR or the Executive to audit adequately whether Network Rail is delivering on cost efficiency and outputs in relation to the priorities that the Executive sets for the ORR?

Tim Martin Office of Rail Regulation
link

Our ability to measure will not necessarily reflect Network Rail's management structure. Network Rail will give the committee further details, but some aspects are more centralised, while others are more decentralised. The key area is no longer what used to be called regions. We are sure that we will have and will be able to provide to the committee on a consistent basis all the right information relating to Scotland from across the company. The committee will be able to see the regulated accounts that we produce annually—to which we will obviously make adjustments to reflect the Scottish component—and to have access to the regular monitoring that we carry out in-between the annual accounts.At the moment, we are consulting on what we call a Network Rail monitor, which will be a three-monthly statement of key performance indicators and costs. The intention is that that will be done on a company-wide basis, but in future we will need to have a Scottish division of the numbers to reflect the Scottish position on a number of those indicators. We will ensure that, regardless of how Network Rail is organised internally, the committee gets the information that it needs on the Scottish situation.

Bristow Muldoon Lab The Convener · Livingston
link

You are content that the organisation of Network Rail will not hinder you in that job.

Tim Martin Office of Rail Regulation
link

Yes.

Iain Smith LD North East Fife
link

I want to return to the regulatory asset base, which is a crucial issue for us to consider in determining whether the arrangements that are being agreed between Scottish ministers and UK ministers are satisfactory. Given the ORR's important role in the process, will you give a bit more information about the factors that will be taken into account in assessing the asset base? I presume that that is not simply a question of calculating the length of track and the number of bridges; I assume that other factors will be taken into account. Will you take into account issues such as the usage of the network and its quality—in other words, the level of maintenance that is required on the network in each area?

Tim Martin Office of Rail Regulation
link

The figure on the opening position for the whole company is fixed, so we are talking about apportionment. Under the regulatory principles, there are various ways in which we can say how we come to a figure. It is our ambition that charges should be as reflective of costs as possible. If charges were completely reflective of costs, we would be able to say that the sums were the same but, in Scotland, there is currently a discrepancy between the percentage that is represented by costs and the percentage that is represented by charges. In other areas in which there has been a separation of that sort, such as the gas industry, there has been a concern that charges should remain constant for the end user, so the percentage that was represented by charges has been used. In this case, that is not so much of a consideration because the discrepancy is being paid for by Government rather than by passengers. However, we will consider the range between apportioning on the basis of a percentage of costs and on the basis of charges.On usage, there are arguments about whether we take vehicle miles or simply track miles, which is a matter on which we want to consult further.

John Thomas Office of Rail Regulation
link

When Ernst & Young considered a range of factors to disaggregate the RAB, we suggested that it might consider using what we call equated track miles, which is exactly what Iain Smith suggested: an adjustment for track miles that is based on the quality or capability of the track. Potentially, that is a reasonable metric for allocating the RAB and is one of the metrics that we will suggest in the consultation document. Paul McMahon might remember what value is arrived at using the equated track miles method.

Paul McMahon Office of Rail Regulation
link

From memory, it is higher than 10 per cent.

John Thomas Office of Rail Regulation
link

That method is one possibility. We agree that adjustment ought to be made for the value, capability or quality of the assets.

Tim Martin Office of Rail Regulation
link

Simply using track miles has drawbacks, because track varies so much in quality and usage.

David Mundell Con South of Scotland
link

How will your current organisation change to deal with the new arrangements, given the clear link with the Scottish Executive?

Tim Martin Office of Rail Regulation
link

As a result of the white paper and the bill, the ORR will take on new UK-wide functions. One is the advice and assistance role and the other is a direct responsibility for safety regulation. On the separation issue, we will probably have one group of people who concentrate on the advice and assistance role, so we will be well equipped to maintain dialogue with the Scottish Executive and the Scottish ministers in the development of the high-level output specification and the iterative process, which is the new arrangement for access charges reviews. There will be constant discussion about Executive proposals. We will evaluate them, consider the options and perhaps say, "You can't have this for that amount of money." We will have a group of people to carry out the advice and assistance role, within which there will be people who are designated to deal with the Scottish Executive and the Scottish ministers. That will provide continuity and will allow us to understand exactly what the Scottish Executive's needs are and where it is coming from.Members of Her Majesty's railway inspectorate are stationed throughout England and Wales, as well as Scotland, which will deal with the Scottish dimension on safety issues. Reporting and monitoring will be part of the wider exercise. We will ensure that we treat both Governments and all parts of the two countries in the same way.

John Thomas Office of Rail Regulation
link

It is worth pointing out that we will publish a draft corporate strategy for consultation during the next month, which will contain high-level corporate strategy and indicate the additional resources—if any—that the ORR might need to deliver adequately its additional roles and responsibilities, in particular in relation to the advice and assistance function, which is very important. That will not include taking over safety, which is a much bigger issue, but we as the executive will put broad-brush proposals to our board next week on the resources that we think that we will need to deliver our new responsibilities.

Tim Martin Office of Rail Regulation
link

We will need more resources, but we are trying to keep that as tight as possible.

David Mundell Con South of Scotland
link

It is interesting that the Scottish Executive paper says in relation to the ORR:"No transfer of resources is required to reflect these arrangements". Will you bid for more resources from your organisation's existing pot?

Tim Martin Office of Rail Regulation
link

Our costs are paid by the licence holders: Network Rail and the operating companies. I am not sure how that is dealt with between the UK and Scottish Governments in so far as the Governments make transfers to the licence holders.

John Thomas Office of Rail Regulation
link

We are talking about the advice and assistance role, not just in relation to the transfer of responsibilities to Scottish ministers, but more widely in relation to advice and assistance to the secretary of state, which is a new role that we have not had in the past. We might well be able to shift resources, reprioritise, do things differently and become more efficient in some areas. We are currently considering such measures and we will make recommendations to the ORR board on the matter. Generally, the office will have a greater role and greater responsibilities, which might need a few additional resources.

David Mundell Con South of Scotland
link

The minister will need to satisfy us that you will have the resources that you need to be able to carry out the responsibilities that you will be given in Scotland.

Tim Martin Office of Rail Regulation
link

We will be very sure that we get those resources.

Michael McMahon Lab Hamilton North and Bellshill
link

I was interested in Tim Martin's comments about how the UK and Scottish Governments will be treated in the same way. Will the Westminster Government have control over the costs of investment? Will the Government in Edinburgh have the same control under the proposed arrangements?

Tim Martin Office of Rail Regulation
link

There is an element in the settlement that relates to enhancements—I think that the figure is £17 million. Within that, I believe that the enhancements will be specified by each Government. By "enhancements", I mean new developments over and above renewal and maintenance. Is that what you were getting at?

Michael McMahon Lab Hamilton North and Bellshill
link

I am talking about the direct control over Network Rail and Scottish ministers' input. You said that there will be a huge role for Scottish ministers.

Tim Martin Office of Rail Regulation
link

Yes, in relation to the high-level output specification.

Michael McMahon Lab Hamilton North and Bellshill
link

If Scottish ministers do not control the cost of investment, will the Westminster Government have control of such matters? If it will have such control, are both Governments being treated equally?

John Thomas Office of Rail Regulation
link

Both Governments are being treated equally, because what is envisaged is that Scottish ministers and the secretary of state will say, "These are the high-level outputs that we want out of the railway in Scotland, England and Wales and this is how much money we have to provide those outputs." An iterative process will follow, whereby the ORR will undertake an initial assessment of the cost of the required outputs. If the cost differs from the amount of money that Governments want to spend, the iterative process will offer an opportunity for Governments to say, "We want to change the outputs in this way," or, "We are prepared to provide more money." The process will work in exactly the same way for both Governments.

Paul McMahon Office of Rail Regulation
link

That is right. When the Scottish Executive and the secretary of state have specified the outputs that they want and the funding that they will make available, we will set out the framework for carrying out the periodic review of access charges. Network Rail will then submit its strategic business plans, with its funding requirements. We will challenge and audit those, using the same principles in both Scotland and England.

Michael McMahon Lab Hamilton North and Bellshill
link

So Westminster has no more power to influence investment than the Scottish Executive has. The same dialogue takes place between you and both Administrations.

Tim Martin Office of Rail Regulation
link

I understand that there are two distinct pots of money and output specifications. We must treat both in the same way.

Paul McMahon Office of Rail Regulation
link

We would consult on our approach to undertaking an access charges review. We would then carry out a detailed efficiency challenge and audit of Network Rail's assessments. In our consultation document and framework methodologies, we would explain how we intended to do that across Great Britain as a whole and any differences that there might need to be to take account of circumstances in Scotland or the rest of GB. Any consultancy work that we commissioned as part of the challenge and audit would be published, in the way in which that has happened historically.

Michael McMahon Lab Hamilton North and Bellshill
link

However, the Westminster Government has no more influence over you than the Scottish Executive has.

Tim Martin Office of Rail Regulation
link

Certainly not. Each output specification will refer to those elements that are devolved, which is an issue that the committee is debating. Within that constraint, we treat them exactly the same.

Iain Smith LD North East Fife
link

If Scottish Executive or UK ministers specify an output that they think they should be able to get for the money that we can afford to give, but you then say that we need to spend more, who can say to the ORR that they want it to drive Network Rail harder to get better efficiencies and more outputs for the money that has been invested? Who has the final say—UK ministers, Scottish ministers or no one?

John Thomas Office of Rail Regulation
link

We will have the final say regarding how much the outputs cost.

Iain Smith LD North East Fife
link

What happens if we are not happy with that and think that the cost base of Network Rail has not been reduced sufficiently compared with Irish Rail, for example? We might ask why Network Rail is unable to provide a service for significantly less, when Irish Rail is able to do so. Who can require the ORR to have Network Rail drive down its cost base further?

John Thomas Office of Rail Regulation
link

That is part of the normal consultation process that we undertake and the audit and challenge that we provide to Network Rail. During the previous review we received extensive comments and some parties did extensive work on the amount by which they thought Network Rail's costs should be driven down. We take all such views seriously into account. Ultimately, we must reach an independent view and judgment of the amount by which Network Rail should realistically be able to drive down its costs and of what the efficiency savings in the business should be.

Tim Martin Office of Rail Regulation
link

We use a wide range of measures and some transparent comparisons and benchmarking, both within Network Rail and in other companies.

John Thomas Office of Rail Regulation
link

And internationally.

Tim Martin Office of Rail Regulation
link

As John Thomas says, this is a very transparent exercise. At the end of the day, we must make a judgment on Network Rail's ability to make further efficiency gains. It is for politicians to determine how much they want to spend and what they want to get out of that. However, we are responsible for working out what it is reasonable to give Network Rail in order for it to deliver the specification, and for efficiency issues.

Paul McMahon Office of Rail Regulation
link

There is provision in the bill for referral to the Competition Commission, if parties are not happy with the periodic review determination.

Bruce Crawford SNP Mid Scotland and Fife
link

I thank the witnesses for coming to give evidence today. I will come back to the issue of the regulatory asset base, because in future that will determine the baseline from where we start. Once we start applying the Barnett formula we will, unless we change it, be stuck with that 8.9 per cent increase, or whatever it is, every year. It is vital that we get a fair settlement for both sides.All that I can do is seek assurances from you that the detail that you look for from Network Rail will be robust. Network Rail has kindly provided us with some rough figures—sorry, I should not say that they are rough; I do not know how accurate or otherwise they are. Network Rail has kindly provided us with some key overall facts and figures about the infrastructure across GB and Scotland. Although I realise that it is not as simple as looking at the bald figures, the 10 per cent figure does not appear to be as robust as it might seem. Network Rail indicates that there are 14,000 bridges in Scotland and 40,000 in the rest of the UK. According to the times-10 ratio we would expect there to be 140,000 bridges in the rest of the UK, although the bridges in Scotland are probably a lot smaller and do not have as many trains going on them.How will you audit the key facts and figures that Network Rail provides you with? How will you judge whether Network Rail has come to the asset value properly and what the state of historic spend on the asset has been? It may be that either the rest of the UK, or Scotland, has traditionally had a lower level of spend and that therefore the asset is not at the maintenance level that is required. All those issues will need to be examined to establish what the final settlement might look like. I seek an assurance that you will look at the overall central costs of running Network Rail and ensure that we in Scotland and in the rest of the UK have a fair element of that cost built into our RAB, because the money that we pay to Network Rail will be an on-going cost. I seek assurances that the level of detail that is required will be examined by the ORR and that the Local Government and Transport Committee and the Scottish ministers will be able to see the information in a transparent way. I will ask you about one other matter, but I will let you respond to those points first as I have asked a lot of questions.

Tim Martin Office of Rail Regulation
link

You make good points that illustrate why we have to consult others on the matter. Ernst & Young has done a thorough job on behalf of the Scottish Executive. That is a starting point. We will clearly have to take our own advice and look at the detailed measures and put together a matrix of all the different considerations. As you know, we have to remember that the RAB is not a fixed asset valuation, so it is complicated; we are talking about apportionment, but what you say is perfectly fair. It is necessary to consider the individual assets and see how they might take us in a particular direction in apportioning the overall total. We would take advice on that and, as I say, have regard to the work that Ernst & Young has already done.

Paul McMahon Office of Rail Regulation
link

As Tim Martin said, we worked hard with Ernst & Young, but it has been on the basis—Ernst & Young has commented on this—of a data set that does not give us perfect foresight. Ideally, in making a financial settlement such as that which the Executive seeks to make you might want to have 10, 20 or 30 years of financial projections, but that is currently not possible. Network Rail does not provide financial forecasts for its expenditures beyond 10 years, and even a 10-year forecast is done at a national level for Scotland or for other areas of England and Wales. Network Rail provides detailed three-year forecasts. In addition, we have information over a five-year control period. Therefore, the Ernst & Young analysis for the Scottish Executive is based largely on a three or five-year forecast. Things can happen after five years and we will address those at the next access charges review in 2008. However, we have not yet undertaken a review or assessment of the likely path of efficiency savings in the fourth control period starting in 2009. We have not assessed the rate of return or the cost of capital, which are key building blocks for Network Rail's revenue requirements.

Tim Martin Office of Rail Regulation
link

We assure you that we take this matter seriously, which is why we have not just said, "That is the right number."

Bruce Crawford SNP Mid Scotland and Fife
link

That is reassuring. I have a couple of further questions. First, when was the Ernst & Young report completed? Secondly, can you tell us what the railway consists of? Our adviser suggested that good question. London Underground Ltd obviously runs a fair chunk of its infrastructure above ground and it receives resources from the Government to maintain that. We could say the same, as has been pointed out, about the Glasgow underground, which is also part of the issue. For the final settlement, will you consider what the railway consists of? That will obviously affect the longer term, as far as the Barnett formula is concerned. If money goes into the London underground in future, that will not necessarily be reflected in the Barnett formula. Therefore, we need to get it right at the beginning and ensure that we know what the railway consists of.Finally, on page 3 of the Scottish Executive paper that we received, it is stated that the ORR will come up with the RAB. What happens if the parties do not agree? Who has the final say?

Tim Martin Office of Rail Regulation
link

I will take those points in order. You asked about the Ernst & Young report. The date that we have for that is 20 December 2004, I believe.

Paul McMahon Office of Rail Regulation
link

The final report is dated 20 December. There is a slide pack. However, there have been meetings and discussions since that date.

Bruce Crawford SNP Mid Scotland and Fife
link

I also asked about the London underground and who has the final say.

Tim Martin Office of Rail Regulation
link

You asked what the railway consists of. We assume that it is the assets that Network Rail owns, which form part of the RAB. I am not sure how the London underground piece—

Paul McMahon Office of Rail Regulation
link

We do not regulate the underground.

John Thomas Office of Rail Regulation
link

Although we will in future, of course, have responsibility for the safety duties in respect of those railways. However, in terms of the cost allocation, our economic regulation functions do not extend to the likes of the London underground.

Bruce Crawford SNP Mid Scotland and Fife
link

I accept that and understand the position that you are in legally. However, for the final settlement, you will have to help make a decision about what the RAB is for Scotland. I would have thought that there must be a judgment about how much of the London underground is actually railway, because London Underground Ltd receives money from the Government. Therefore, we need an equal share to run the facilities that we might have in Scotland in future. That is perhaps something that you need to go away and talk about.

Tim Martin Office of Rail Regulation
link

We need to consider that matter further and we will give you any subsequent thoughts on it. However, we are working on the assumption that what we are looking at is an apportionment of the Network Rail assets, both in England and Wales and in Scotland.

Bristow Muldoon Lab The Convener · Livingston
link

I suspect that that is more of a political question.

Bruce Crawford SNP Mid Scotland and Fife
link

It probably is a political question. Civil servants are listening and if the seed is planted now, perhaps they can get to the minister before he comes to tomorrow's committee meeting.

Bristow Muldoon Lab The Convener · Livingston
link

Mr Crawford's final question was about dispute resolution.

Tim Martin Office of Rail Regulation
link

I repeat what we said about efficiency. We will consult extensively, but ultimately we will have to decide.

John Thomas Office of Rail Regulation
link

The ORR will have to decide what number we think is the fair apportionment, taking into account all the work that has been done and everything that everyone has said.

Bruce Crawford SNP Mid Scotland and Fife
link

What happens if we, or the rest of the UK, say, "Sorry, we don't agree with you"? Where do we go?

John Thomas Office of Rail Regulation
link

Generally, that is the whole point of consultation. If we were suggesting something that nobody agreed with, I do not think that we would be doing our job correctly. Of course, we have to take on board everybody's views and comments, but ultimately, as Tim Martin said, we have to come up with a conclusion and a view. It is our job to do that. The extent to which you take that on board in the financial settlement is an issue between Scottish ministers and the secretary of state. Ultimately, however, we will have to conclude on the principles, because we will want to apply those principles, if necessary, to other parts of the network.

Paul McMahon Office of Rail Regulation
link

John Thomas and Tim Martin may know about this in detail, but ultimately there could be a judicial review of ORR decisions.

Tim Martin Office of Rail Regulation
link

Normally, if nobody agrees, then you have got it right, I think.

Bruce Crawford SNP Mid Scotland and Fife
link

That is probably a fair point, but I suppose that, mischievously, it leads me to the question of who appoints the ORR, because they have probably got the real final say. I do not expect you to answer that. I am sorry; that is cruel of me.

Tim Martin Office of Rail Regulation
link

We shall defer on that.

Bristow Muldoon Lab The Convener · Livingston
link

I shall follow on from some of Bruce Crawford's questions about the regulatory asset base. Page 3 of the Executive's document states:"The £302m sum takes into account track access income from cross-border passenger and freight operators."Two questions follow on from that. First, do you have any explanation for how the allocation of cross-border passenger track access has been reached, and is there a formula that you have given to the relevant Governments to calculate the share of track access between England and Scotland, particularly in terms of the Great North Eastern Railway and Virgin franchises? Secondly, does that mean that the ScotRail track access charge is in addition to that £302 million sum, given that it is not referred to in that sentence? That might not be an issue that you can respond to, but if you can respond it would be helpful.

John Thomas Office of Rail Regulation
link

I shall answer to the extent that I can. My understanding is that ScotRail's track access charges are included in the calculation, but GNER's and Virgin's track access charges are actually excluded from the calculation. There were on-going discussions about having a proportionate split of the fixed charges between England and Wales and Scotland, and it was decided that that was complicating matters and would be excluded from the settlement. There is no assumption that Network Rail Scotland, if you like, receives access charges within Scotland from GNER and from Virgin. That is my understanding. Like everyone else, I would have to look at the final details of the settlement.

Bristow Muldoon Lab The Convener · Livingston
link

The document says:"The £302m sum takes into account track access income from cross-border passenger and freight operators."

John Thomas Office of Rail Regulation
link

The Executive has said, "This is what we believe the revenue requirement to be in Scotland for Network Rail. This is how much track access income Network Rail is receiving from the likes of ScotRail and from freight operators. What is the shortfall?" That is how the calculation has been done.

Tommy Sheridan SSP Glasgow
link

I would like to investigate your overall raison d'être. Would it be fair to say that you exist as a guardian of the public pound? Is your role effectively to ensure that there is value for money for the public pound?

Tim Martin Office of Rail Regulation
link

Yes. We have public interest duties in our statutory duties. You are right to say that the bill proposes that the value-for-money point should be explicitly made, and there is an amendment to the Railways Act 1993 to make that clear in the proposed wording that is being considered at the moment. That is our objective.

Tommy Sheridan SSP Glasgow
link

So you are not just auditors of the money that is being spent; you also have a role in discussing whether that money is being best spent.

Tim Martin Office of Rail Regulation
link

As with many of the other privatised industries, when the ORR was set up, it was clear that, whether or not public money was involved, there was a need to ensure fair play among all participants in the industry—the operators and the infrastructure provider. Because the infrastructure provider does not have any competitors to require it to behave as a company normally would in a competitive market, there is a need to ensure that it does not abuse its monopoly by overcharging its customers and that it acts in the public interest. The ORR's role was always to ensure that all those things happened and, in particular, that Network Rail acted in the public interest. That has been emphasised in the amendments in the bill that highlight the value-for-money point.However, it is not only a question of price checking. We have to decide through consultation and extensive due diligence work what it is fair to ask Network Rail to do and how much it is fair for it to be paid to deliver a certain result. If somebody says that they want a certain kind of railway—with a certain number of lines that will take freight, a certain number of passengers and a certain level of service—we have to do our work and come up with what, in our best judgment, it is reasonable for Network Rail to charge them for providing that railway and what the efficient cost of doing so is. Judgment is involved in getting to that point, but we take an entirely objective, impartial approach to ensure that both sides are fairly treated.

Tommy Sheridan SSP Glasgow
link

Based on that "entirely objective, impartial approach", can you tell me whether the level of public investment in the railway industry in Scotland and throughout the United Kingdom is higher or lower than the pre-privatisation level and whether we are getting more or less for the public pound?

Tim Martin Office of Rail Regulation
link

I cannot give you the precise numbers for investment before and after privatisation, but it is fair to say that investment is now at a record level and we are doing our utmost to ensure that the public get value for money for that investment. In the most recent access charges review, we carried out an extensive analysis of whether the money was being spent wisely. In fact, we reduced by a significant amount the amount that Network Rail asked for. Network Rail is now getting what we consider to be an efficient amount to provide the services that are required by the increased amount of usage. Since privatisation, usage has gone up by around 30 or 40 per cent and, as I said, investment is at a record level.

Tommy Sheridan SSP Glasgow
link

Did the ORR have a value-for-money role in Network Rail's decision to take maintenance in house or was that entirely Network Rail's decision?

Tim Martin Office of Rail Regulation
link

One of the things with which we were concerned in the most recent review was the efficiency of the work that is being done. Network Rail has taken the view that it can get more efficient work out of an organisation that it controls. We have listened to its arguments for that and, as we stand today, they seem good. There is also a safety issue, and Network Rail believes that having more direct control of maintenance produces a better result all round.

John Thomas Office of Rail Regulation
link

It is important to point out that as a regulator we are not there to micromanage the company. We set what we think are challenging efficiency targets for the company to meet, but to a large degree it is up to the company to organise itself in the way that it sees fit to deliver those targets. One of the things that Network Rail decided it could do to improve its efficiency and meet those targets was to bring maintenance back in house. Clearly, the ORR needs to be satisfied that the proper processes are in place so that the company can manage the transition and so that the outputs are not affected—it can still deliver what it is supposed to be delivering while the transition takes place. We are clearly interested in certain things, but Network Rail made the management decision to bring maintenance back in house to deliver the outputs and the efficiency requirements.

Tommy Sheridan SSP Glasgow
link

The reason I asked about your being the guardian of the public pound is that it appears that Network Rail is stretching the public pound further by deciding to take in house a function that had been outsourced. According to you, efficiencies have come out of that. I would have thought that the ORR was concerned with such decisions. Have you asked Network Rail to consider whether renewals of the network would be better served in house rather than out house?

Tim Martin Office of Rail Regulation
link

As John Thomas said, we have set out the framework for Network Rail, and it is up to Network Rail to determine whether it gets the best efficiency and performance results from its decisions. We would generally expect it to come forward with proposals and we would ensure that it was able to make changes without jeopardising any part of the business. It could make a case for a change, but we would not take an initial view and say, "You ought to be doing this or that," because that would lead us quickly down the road of micromanaging the company, which is not the way in which the ORR thinks that the industry should be run. We will make that clear in our corporate strategy document, to which John Thomas referred. In essence, the industry has to be run at operational level by the companies. I am certainly not qualified to run a railway infrastructure company so I would not presume to tell the companies how to do that.

John Thomas Office of Rail Regulation
link

We are interested in whether Network Rail delivers on its efficiency targets. If it was not doing that, we could take certain steps, including taking enforcement action and asking the company for a recovery plan for getting back on the efficiency trajectory. Holding the company to account, monitoring it and taking enforcement action are within our gift. It is important to emphasise, as Tim Martin has done, that we are not there to tell Network Rail how to run its business.

Paul McMahon Office of Rail Regulation
link

We have had an access charges review and we undertake a lot of efficiency assessment and benchmarking that includes other parts of Network Rail and railway companies in other countries. Those studies might—or might not—reveal that in-sourcing or outsourcing is best practice, which would inform our determination of the efficiency trajectory for Network Rail. We also encourage Network Rail to undertake its own benchmarking. I believe that it is a member of a European benchmarking working group, which would reveal best practice.

Tommy Sheridan SSP Glasgow
link

Has the ORR specifically sought the extra role in relation to rail safety?

Tim Martin Office of Rail Regulation
link

No.

Tommy Sheridan SSP Glasgow
link

What expertise does the ORR have in relation to rail safety?

Bristow Muldoon Lab The Convener · Livingston
link

I think that we are getting a bit off the track, as our main purpose is to debate the UK Railways Bill. The allocation of different responsibilities was done separately by the Secretary of State for Transport. I will allow Tim Martin to answer the question, but I do not want us to go too much further down that road.

Tim Martin Office of Rail Regulation
link

There is a short answer.

Tommy Sheridan SSP Glasgow
link

I should make the point that, under the bill, the ORR will be responsible for the regulation of safety across the railways, and I want to know what makes people in the ORR qualified to be responsible for safety.

Tim Martin Office of Rail Regulation
link

The question is perfectly reasonable.

Bristow Muldoon Lab The Convener · Livingston
link

I am trying to stress that we are considering and scrutinising the devolution of powers to Scottish ministers.

Tommy Sheridan SSP Glasgow
link

That includes the power that will be accorded to the ORR in relation to railway safety in Scotland. I want to know what qualifications people in the ORR have to ensure that the railways in Scotland are safe.

Tim Martin Office of Rail Regulation
link

As I said, there is a short answer. Earlier, we discussed increasing our resources by a smallish percentage; we also discussed the increased responsibilities on the economic regulation side, the matter of advice and assistance and so on. As far as safety is concerned, the people who do the job with the Health and Safety Executive at the moment are becoming part of the ORR. The question of our expertise does not really arise, as the people with expertise are becoming part of the ORR.

Tommy Sheridan SSP Glasgow
link

The body that will be responsible for financial efficiency will also be responsible for safety.

Tim Martin Office of Rail Regulation
link

That is right.

Tommy Sheridan SSP Glasgow
link

That would make the railways the only industry in Britain for which that is the case.

Tim Martin Office of Rail Regulation
link

Both safety and economic regulation are handled within the Civil Aviation Authority, which is considered a model that has worked well. We have published a letter, which I think has been made available to the committee, detailing our emerging thinking on how we intend to work the economic and safety regulation functions together. I would be happy to follow up on that matter on another occasion if the committee wishes more information. I think that the letter sets out most of the details.

Tommy Sheridan SSP Glasgow
link

If we could get a copy of that letter, that would be great.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

As I understand it, the ORR is an economic regulator.

Tim Martin Office of Rail Regulation
link

Indeed.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

You have mentioned that you have efficiency targets. I will ask you a very simple question: how inefficient is Network Rail at present, in percentage terms?

Tim Martin Office of Rail Regulation
link

I suppose that it is a question of comparators.

John Thomas Office of Rail Regulation
link

During the access charges review last year, we required Network Rail to reduce its unit costs to improve its—

John Thomas Office of Rail Regulation
link

By 31 per cent across the business over five years.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

If the bill is passed in its current form, would the figure of 31 per cent be applied to Scotland and England uniformly?

Tim Martin Office of Rail Regulation
link

In the current control period, yes it would. Going forward, we will be assessing the two parts of the network. We need to consider further how separate the price reviews will be in the future. We will examine Network Rail's projected costs for each part and will form a view on the scope for efficiency savings in that projected expenditure. If Scotland is incredibly efficient today, it might be that the scope for efficiency savings going forward is smaller than in an area where Network Rail is very inefficient. There will be regional efficiencies. More detailed benchmarking requires to be done to establish the relative efficiencies and the way in which they lie between the different parts of the company. Going forward, we will take that into account.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

If you do not know how inefficient or efficient Scotland is, how are you able to conclude that you would apply a 31 per cent reduction before the current cost period comes to an end?

Paul McMahon Office of Rail Regulation
link

The reduction would apply not necessarily pro rata but equally across the entire Network Rail business.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

With respect, that is not really an answer. You said that you are planning to apply a 31 per cent reduction to Network Rail's spending across the UK. However, you also say that you have not yet formulated a picture of whether the position in Scotland is more or less efficient. My question, which has only occurred to me in light of your evidence that you do not know the facts, is how you can have reached the decision to apply such a reduction.

Tim Martin Office of Rail Regulation
link

The 31 per cent represents the overall requirement on Network Rail. Its obligations will not change as a result of the settlement, which has been decided between the Governments and takes into account assumptions about relative efficiency. However, we have been asked to consider not that question, but the allocation of the RAB that we discussed earlier.

John Thomas Office of Rail Regulation
link

Network Rail's forward-looking costs have to be consistent with its regulatory revenue allowance across the entire network. It is allowed a certain amount of money and, as a business, it chooses where to spend that money, subject to delivering on outputs across the network. It has produced a business plan allocating moneys to Scotland that have to include efficiency savings. To that extent, the settlement already takes into account efficiencies that Network Rail believes that it can generate in Scotland for this control period.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

When does the control period end?

John Thomas Office of Rail Regulation
link

It ends on 31 March 2009.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

So we are talking about the next four years.In response to Iain Smith, you said that you had suggested to Ernst & Young that it might use as a criterion for cutting the cake a formula that, unless I misheard you, you described as equated track miles. Is that right?

John Thomas Office of Rail Regulation
link

That is right. That was one of the options that we suggested could be used; however, as we have been discussing in a lot of detail, there are other options. We need to do much more work to determine which is the most appropriate.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

I think that it is right to say that the equated track miles criterion was not applied in this respect. Instead, it was broadly the Barnett formula that was used.

John Thomas Office of Rail Regulation
link

We will need to see the exact details of the criteria that were used to reach the 10 per cent figure. We have not seen those yet.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

Have you seen Ernst & Young's final report?

John Thomas Office of Rail Regulation
link

Yes but, as we have said, it contains a higher figure.

Paul McMahon Office of Rail Regulation
link

The final report that we have seen, based on a 20 December presentation, used a value of 13.3 per cent. That figure was based on track kilometres.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

In your judgment, how many track kilometres are there in the infrastructure in Scotland?

John Thomas Office of Rail Regulation
link

We do not have the exact figures to hand. Network Rail is probably better placed to answer that question.

Bristow Muldoon Lab The Convener · Livingston
link

Network Rail has distributed to committee members figures for track kilometres in Scotland compared with the rest of GB.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

Would you expect Network Rail's figures to agree with the Scottish Executive's figures?

John Thomas Office of Rail Regulation
link

You would have thought so, because Ernst & Young would have been asked to provide them.

Paul McMahon Office of Rail Regulation
link

In all the dialogue, there has been no dispute over the factual value of the length of track kilometres, the distance of equated track miles or any of the other metrics. Instead, the dispute has been over whether such aspects are applicable to the disaggregation of the RAB.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

My question is not entirely a trick one—I am not trying to trap you, gentlemen. The information that I have from the Scottish Executive is that there are 5,489 track kilometres in Scotland, but the figure that we received from Network Rail—after this meeting had started, in fact—is 4,140. There is a huge gap between those figures, but perhaps there is an explanation that relates to the classification of track into the various categories.

John Thomas Office of Rail Regulation
link

That may well be the case. You highlight the importance of a thorough and robust consultation exercise by the ORR.

Bristow Muldoon Lab The Convener · Livingston
link

We will probably need to clarify the issue with Network Rail and the Executive when we hear from them in due course.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

Indeed. It is just a shame that we have to take up time with such points, which the Executive should have clarified beforehand.Moving on, I am told by the clerks to the committee that the Ernst & Young report is not in the public domain yet, despite the fact that you said that it was signed off on 20 December and that you have seen it. To clarify the position, I point out that we have not seen the report because it has not been put into the public domain. John Thomas said certain advice was given to Ernst & Young about equated track miles, and I think that Tim Martin said that if that criterion was employed a figure of more than 10 per cent would arise.

John Thomas Office of Rail Regulation
link

I do not want to get hung up on the point about equated track miles, which was just an example of some of the comments that we provided to Ernst & Young while it was compiling its report. It looked at a range of factors.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

I understand that. Perhaps I understood Mr Martin wrongly—I think that it was Mr Martin who commented on the matter earlier. Were you advocating that that particular criterion should be used or were you simply listing it as one of the possibilities?

Tim Martin Office of Rail Regulation
link

We were simply commenting that it was another possibility.

John Thomas Office of Rail Regulation
link

We were not advocating that measure.

Paul McMahon Office of Rail Regulation
link

On the level of expenditure on maintenance, renewals and operating costs in Scotland, Network Rail is spending about 9.5 to 9.7 per cent, as I mentioned earlier. The track kilometre breakdown gives us a figure of 13.3 per cent, which struck us and Network Rail as an outlier, given the overall range of financial expenditure values. The question is whether those levels of financial expenditure are in a steady state. If they are, that could be a strong basis for disaggregating the regulatory asset base to Scotland. From our perspective, that is a good reason to ask why track kilometres were used.Network Rail will obviously explain its position, but it suggested that vehicle kilometres—the distance that is travelled by trains—would be an appropriate metric. From memory, that gives a figure of about 9 to 9.5 per cent, which is quite close to the levels of expenditure in Scotland at the moment. That gave us further justification to question the use of track kilometres. We suggested that using equated track miles is a slightly more sophisticated way in which to deal with track; we threw that into the ring as an appropriate metric that Ernst & Young might want to consider in its analysis.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

So you did not recommend or advocate a particular criterion. You simply gave Ernst & Young an opinion on the variety of criteria that could be employed. Could you share that document or series of documents with us?

John Thomas Office of Rail Regulation
link

Yes—no problem. We provided comments throughout the exercise and we can certainly share them.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

To go back to the principle of the thing, your argument, as I understand it, is that 10 per cent is fair because that is a reasonable assessment of Scotland's share of the costs. Is that right?

John Thomas Office of Rail Regulation
link

I do not think that we said that 10 per cent is fair.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

I thought that Tim Martin began by making remarks to that effect and that 10 per cent was not out of the ballpark.

John Thomas Office of Rail Regulation
link

That is right. It does not appear to be out of the ballpark.

Bristow Muldoon Lab The Convener · Livingston
link

I think that you also used the word "reasonable".

Tim Martin Office of Rail Regulation
link

Yes.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

It is reasonable but not necessarily fair. Is that it?

John Thomas Office of Rail Regulation
link

We have to include the caveat that we need to undertake a more thorough exercise and further consultation before we come to a final decision.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

You have not done that work so you do not know how efficient or inefficient we are in Scotland, and you certainly do not know what the assets are worth. There are a lot of things that you do not know.

Bristow Muldoon Lab The Convener · Livingston
link

We need questions at this stage, Fergus, rather than speeches.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

If I may, convener, I will come to what I think is a critical point. Surely the two Governments, in determining how the resources should be allocated between them, should not have considered simply what has been spent. One could argue that, historically, spending has been woefully inadequate on both sides of the border compared with spending in other countries in Europe, or that companies have been hugely inefficient since privatisation. Surely an audit of need—in other words, what is required to bring the rail infrastructure in Scotland and England up to a higher standard—is another criterion that, in terms of high policy, should at least have been considered. Was that one of the criteria that you communicated to Ernst & Young?

Tim Martin Office of Rail Regulation
link

In a sense, the need is the figures that have been projected by Network Rail for spend in the current control period.

Paul McMahon Office of Rail Regulation
link

The need is based on the national-level outputs that were determined as part of the access charges review. Those are the outputs and baseline in respect of need.

Tim Martin Office of Rail Regulation
link

Those figures show the need as we go forward; they show what Network Rail said that it will need to spend.

Paul McMahon Office of Rail Regulation
link

The need at the next access charges review, which will be concluded in 2008, may well differ in both England and Wales. Of course, in Scotland, the need will be based on the high-level output specifications that Scottish ministers will produce.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

I have a final question, convener. Everyone is getting quite a good shot today, and I would not—

Bristow Muldoon Lab The Convener · Livingston
link

I am sure that you will get your fair share of questions.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

One point that has been made is that, under the proposals that are before us, the Scottish Executive will be the paymaster, if you like, but the Railways Bill, as introduced, seems to allow the Executive absolutely no power, legislative control or influence over how Network Rail operates and how it spends the money. We have spending power, but no responsibility—I am sure that we all remember whose prerogative that was once said to be. How can we have any influence over Network Rail under the current system, when it is not at all accountable to the Scottish Parliament, despite the fact that the Scottish Executive will pay for Network Rail's Scottish operations?

Tim Martin Office of Rail Regulation
link

You will say what you want—that is where you have power. You have the power to determine what you want in respect of the railway, and Network Rail must provide that. We will say how much that will cost, and you will ask whether you can afford it. Your requirements are encapsulated in what is known as the binding arrangement. Your high-level output specification will become the outputs that are funded by the review. Following that, Network Rail must deliver those outputs for the money. There will be a binding arrangement, which we would describe as a reasonable requirement of the funder—which is the Parliament—and it will be up to the ORR to enforce that binding arrangement on your behalf.

Fergus Ewing SNP Inverness East, Nairn and Lochaber
link

So we are in your hands, gentlemen.

Tim Martin Office of Rail Regulation
link

What is envisaged for the mechanics of the binding arrangement is delivery of outputs enforced by ORR. A separate information-flow arrangement is being discussed between the Scottish Executive and Network Rail, and that will be monitored both through the ORR and directly.

Bristow Muldoon Lab The Convener · Livingston
link

You and the Scottish Executive's document use the term "binding arrangement" between Scottish ministers and Network Rail. Is that arrangement different from a contract in any way? If not, why is there not simply a contract between Scottish ministers and Network Rail that is enforceable by law?

Tim Martin Office of Rail Regulation
link

For various reasons, Governments have decided that they do not want a direct contractual position with the infrastructure provider. They want to maintain independence and to move away from direct control, which has a number of implications for public funding. Having enforcement from an independent regulator, according to a set of established criteria, is regarded as fulfilling that need better than a direct contract would. There were contracts with the Strategic Rail Authority but they were not regarded as the best way of implementing the requirements. I think that that was one of the reasons why the rail review was held.

Bristow Muldoon Lab The Convener · Livingston
link

Does a binding arrangement imply looser and more flexible accountability than that of a contract, and so perhaps less accountability from the Government's point of view?

Tim Martin Office of Rail Regulation
link

I would not say that the arrangement gives less accountability, but it preserves the independence of the various parties.

Paul Martin Lab Glasgow Springburn
link

I want to ask about the autonomy of the ORR. Serious challenges will result from the Railways Bill and the Scottish dimension that we are discussing today. How will the structure of your organisation deal with the bill for the United Kingdom as a whole, and specifically for Scotland? Could there be a Scottish ORR?

Tim Martin Office of Rail Regulation
link

As I said, we have an advice and assistance role; a performance, enforcing and monitoring role; and an economic regulation role. Specific divisions will deal with each of those roles, so there will be some reorganisation. Our corporate strategy document will make that clear.People in each of the divisions will concentrate on Scotland, but we do not propose to have separate offices; the size of our organisation means that that would probably not be cost effective. Throughout Great Britain, we have to keep down the costs to the public purse.

Paul Martin Lab Glasgow Springburn
link

The Scottish dimension will require additional monitoring. Can you assure us that that will be done carefully?

Tim Martin Office of Rail Regulation
link

Absolutely. We said in our most recent document—we will say it again in our next one—that we support the concept of more local accountability for Network Rail. That extends right across the UK. Customers have to be able to see what they are getting for their money. There will be much more local reporting; much more local commitment of outputs; possibly more local correlation between charges and costs; and, obviously, local consideration of the specification of outputs. We think that that will produce a much more efficient solution that ensures that the company meets the needs of all its customers and funders much better. We support that and will ensure that the arrangements within the divisions of our organisation fulfil that aspiration.

John Thomas Office of Rail Regulation
link

We hope that the document that we issued in September following the finalisation of the white paper, and the forthcoming corporate strategy document on which we are consulting, will clearly show our commitment to ensuring that all the proposals in the white paper work, including the proposals concerning devolution. The forthcoming document is a consultation document and any comments or suggestions will be gratefully received.

Bristow Muldoon Lab The Convener · Livingston
link

That brings us to the end of our questions. I thank Tim Martin, John Thomas and Paul McMahon. The session has been intensive, but it has been useful to the committee's consideration of the UK Railways Bill.I welcome the next set of witnesses, who are from Network Rail, for further consideration of the devolved aspects and financial impact of the bill. The witnesses have been given a copy of the Scottish Executive's statement that was published today on the bill's financial impact on Scotland, which has probably by now been the subject of an announcement by the Secretary of State for Transport, Alistair Darling. I ask the witnesses to comment on that document in their introductory remarks. It would be useful to have Network Rail's initial response on the adequacy of the document in relation to the Executive's ability to support railway investment in Scotland.I welcome to the committee Ron Henderson, who is the group finance director for Network Rail; Paul Plummer, who is the director of corporate planning and regulatory affairs for Network Rail; and Ron McAulay. I do not have Ron McAulay's job title. Are you regional director for Scotland?

Ron McAulay Network Rail
link

Route director for Scotland.

Bristow Muldoon Lab The Convener · Livingston
link

I apologise for the fact that we are overrunning slightly. That is partly the result of the late release of information concerning the financial aspects of the UK Railways Bill, which are a major part of the committee's interrogation of the powers that are to be passed to Scottish ministers and their ability to deliver on their aims and aspirations for the railway industry in Scotland. I invite Ron Henderson to make some introductory remarks.

Ron Henderson Network Rail
link

I apologise on behalf of John Armitt, who would have liked to attend the meeting. I understand that he appeared before the committee last year, but today he had other obligations.We are pleased to be here. In the past few months, we have spent a considerable amount of time dealing with the rail review. We support more devolved decision making and have worked with the Department for Transport, the Scottish Executive and Ernst & Young on the issue for the past couple of months. The Scottish Executive rail review paper appeared just as we were waiting to come into the room. However, although we have not seen the numbers before, we have spent a great deal of time working with those who put together the document. Our initial examination of the document suggests that it is reasonable from Network Rail's perspective. Obviously, we will have to double-check some of the numbers. As members probably know, some work remains to be done on the regulatory asset base. However, we are satisfied with the structure and direction of the agreement. Rather than talk for too long, I would be more than happy to answer the committee's questions.

Bristow Muldoon Lab The Convener · Livingston
link

Thank you. I am sure that you will have plenty of questions to answer, if the previous session is anything to go by.You say that the figures appear to be reasonable. Presumably, you are referring especially to the figure of £302 million for Network Rail's regulatory asset base in Scotland. It is indicated that, broadly, that is a 10 per cent allocation of the overall RAB for GB.I want to be absolutely clear on this point. In its paper, the Executive states:"The £302m sum takes into account track access income from cross-border passenger and freight operators."The answer to a question that I put to the ORR suggested that the figure also takes account of track access charges from ScotRail. Can you clarify whether that is the case?

Ron Henderson Network Rail
link

I understand that it takes such charges into consideration. The income from ScotRail and the other revenue-generating sources is included in the sum, rather than in the figure of £302 million, which is the shortfall.

Bristow Muldoon Lab The Convener · Livingston
link

That is the point that I was seeking to establish. It was not entirely clear from the answers that I was given earlier whether the income from ScotRail was included in the sum or the shortfall. What track access income does Network Rail receive from ScotRail in the current financial year?

Ron Henderson Network Rail
link

Last year, total track access charges from all train operators in Scotland were about a couple of hundred million pounds.

Bristow Muldoon Lab The Convener · Livingston
link

The statement that you submitted to us gave the figure of £191 million.

Ron Henderson Network Rail
link

That is it.

Bristow Muldoon Lab The Convener · Livingston
link

Would that £191 million be broadly in addition to the £302 million?

Ron Henderson Network Rail
link

Yes. That is plus £9 million from freight on the statement that you have, as Ron McAulay pointed out. There is the £191 million and £9 million from freight. That is the income from the train operators. In addition to that, there is the £302 million that we talked about earlier.

Bristow Muldoon Lab The Convener · Livingston
link

We talked to the ORR witnesses about many of the criteria that could be used for determining the appropriate share of expenditure in Scotland as a proportion of the GB expenditure. We talked about the length of track, the usage of track and the types of train that are used on different types of track in Scotland and elsewhere. We also talked about whether the type of infrastructure, such as bridges, might be significantly different in Scotland and in other parts of the UK. The Scottish Executive and the UK Government have come to the broad figure of 10 per cent as a reasonable share of the resources. What is your assessment of that?Some people have raised the issue about track, and the information that you have provided suggests that Scotland has about 13 per cent of the track. Does that take into account the differences between Scotland and England, whereby many tracks in Scotland are single track and many tracks in England, especially southern England, are twin track, four track or eight track? How relevant are the figures and why does the figure of 10 per cent seem reasonable?

Ron Henderson Network Rail
link

Unfortunately, that is not straightforward and there is no one answer. One can look at a number of parameters, one of which, obviously, is track miles. We talk about equated track miles, passenger miles and freight miles, and about the capacity and capability of the different routes. If a range of such things is considered, Scotland's share tends to be somewhere between 7 and 12 to 15 per cent. Without doing a great deal of detailed analysis, we are saying, simply, that 10 per cent seems reasonable. Paul Plummer can give you more information.

  1. Scottish Parliament Local Government and Transport Committee Tuesday 18 January 2005 Committee business · 2
  2. Railways Bill Bill debate · 727

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.