Thanks for inviting me along. I am from the University of Strathclyde’s electrical engineering department, and my research focuses on the operation of a future, heavily decarbonised electricity system and the design of the market structures to go around it. I am also affiliated with the UK Energy Research Centre, working on its building energy infrastructure theme.My key messages probably split into three areas. At the high level, data centre demand is likely to represent a significant portion of future demand at a Great Britain and Scottish level, but currently the connection queue is almost unfeasibly large. A huge number of data centres are asking to join the system, and it is very unlikely that all of them will be able to follow through. I think that the National Energy System Operator has talked about having 80GW-plus of data centres in its connection queue, with 7GW-plus of that in Scotland already. However, the projections from feasible reports that are coming out show that the order of magnitude that might develop over the next five to 10 years is likely to be less than that. NESO has it at around 6GW by 2030, and 9GW or 10GW by 2035.That sets the context for how much capacity might grow, but I would also point out that there are different types of data centre with different energy profiles. When we think about their use of energy, the important question is how much the centres are utilised across the year. Conventional wisdom is that they will want to be heavily utilised and have a high capacity factor, but some of the data that is coming out suggests that the existing ones are not being as highly utilised as we had thought.Therefore, the range of energy use projections over the next five to 10 years is actually very large. Indeed, just last week, NESO revised down its projections and underlying assumptions in that respect. If you were to compare the NESO projections with a report that came out last year from the Department for Science, Innovation and Technology, you would see a really wide range with regard to what energy use might be over the next five to 10 years, and that will need to be bottomed out with more evidence.That, in turn, feeds into the share of demand at data centres. The projections in that respect might be anything from 5 to 20 per cent of GB-level demand. In the Scottish context, you could have a single big data centre representing quite a large proportion of Scottish demand, depending on how heavily it was utilised. Therefore, when we think about that demand, the difference between having one, two, three or even 10 data centres in Scotland becomes very significant.My second point is about location, which is important. It matters for the data centres themselves, because they want to think about things such as latency and how quickly they can communicate what they are doing with their end users. They also need people, the space, planning and consent to build as well as communications infrastructure. They might be interested in what Government support schemes are in place to incentivise where they locate.From a system perspective, which we are more familiar with, locations matter for a couple of reasons. I am particularly interested in researching how much wind we curtail in Scotland. Our studies suggest that locating in Scotland will be helpful for soaking up excess or surplus wind energy, but where you locate in Scotland is also very important. This is an evolving picture; it is not cut and dried. If you think about the system as it is today, with the amount of outages that take place and the upgrades, and where generation is on the system, it is not actually the Scotland-England boundary that is the first constraint but rather the central Scotland boundary—the B4 boundary, as we call it. Locating data centres north of that point will likely be more impactful when it comes to managing constraints, certainly in the near term. That could be further researched, and we could see how it evolves over the next five to 10 years as we build new infrastructure.My final point is around the whole-system impacts of data centres. Adding demand in general will likely put pressure on meeting decarbonisation goals. It is not always windy or sunny, so adding new demand to the system is likely to increase the amount of fossil fuel burn that you have in the system. Locating the data centres in the most sensible places in the system can mitigate the size of those impacts by using up wind energy more than, for example, turning on gas.From a Scottish perspective, it really depends on whether it is a Scottish plant that facilitates the extra fossil fuel burn or whether it comes from down south and is imported here. Another factor is the extent to which on-site, fossil-based generation comes through. Lots of the sites might have diesel back-up systems or whatever, but if it really is a back-up and is used only a very small percentage of time, the impact might be minimal. However, if you are looking at some of the options that are coming through for on-site gas as a primary energy source, that would be without a grid connection. That is probably the worst-case scenario from a decarbonisation perspective.