To ask the Scottish Government what its response is to the petition, reportedly signed by hundreds of Keith residents and businesses, regarding the disruption caused on the A96 by the on-going works at Union bridge, including the calls for businesses to be compensated for any significant losses during these works. (S6O-04312)
Official Report · Chamber
Union Bridge (Petition)
Portfolio Question Time Net Zero and Energy, and Transport
Speakers
Choose an MSP to read only their contributions- Fiona Hyslop SNP 3
- Douglas Ross Con 2
- Audrey Nicoll SNP 1
- Liam McArthur LD 1
The record
7 contributionsWe recognise the on-going impact that those vital and complex repair works are having on the local community and businesses in Keith, following a landslip that resulted in the failure of the wing wall at Union bridge. The operating company that conducts the repairs and road management discussed that with representatives of local elected members, Keith community council and the local traders association in September, and it plans to meet them again shortly to provide an update, once the repair contract is awarded in the coming weeks.
The temporary traffic lights and safety barrier were installed to prevent any further risks to pedestrians and road users, with “business as usual” signage added to continue to direct traffic into Keith and its businesses.
Douglas Ross will be aware that compensation is not payable to any businesses for disruption arising from road works on any trunk road and the motorway network that are required to keep them in a safe condition. Unfortunately, such work can sometimes result in disruption to local communities, but every effort is being made to mitigate impacts.
I do not think that residents and businesses in Keith feel that every effort is being made to mitigate the impacts, because the work has been on-going since last summer.
The cabinet secretary did not mention the petition. What is her response to the hundreds of business owners who have written to her, who have still not received a reply? I handed the petition over to the Minister for Agriculture and Connectivity in December last year. We are now in February, and we do not know what Fiona Hyslop and the Scottish Government think. Will she look at alternative measures to compensate the businesses in question, if it is not possible to provide compensation for work on a trunk road? Those businesses are losing hundreds of thousands of pounds as a result of the works, and they deserve to be compensated.
I have set out the policy on compensation—or, rather, the fact that no compensation is payable in relation to work on trunk roads. I recognised the on-going nature of the problems: it is a complex issue to resolve. The contracting started before Christmas, but it has been delayed as a result of emergency work by utilities companies in proximity to the slope failure. That emergency work required a further review of the proposed design solution that is to be undertaken, so that any additional implications could be considered. The most up-to-date position can be provided to those who have petitioned the Government, although I do not think that we have the contact details for everyone who signed the petition.
On journey times, I understand from our operators that the maximum delay is 12 minutes. I know that a delay of 12 minutes can cause an issue. If Douglas Ross is able to provide information that shows that people are regularly waiting longer than 12 minutes, I invite him to do so, but the information that I have been provided with is that the delay is less than 12 minutes.
As a frequent traveller on the A96, I understand that it was a slope failure as a result of heavy rain that caused the damage to the bridge. What challenges exist in relation to the required remedial work? Given the complexities, is it not crucial that the work be carried out with the utmost care, which will, regrettably, inevitably lead to the work taking longer?
link
Be as brief as possible, cabinet secretary.
The work is a complex operation that needs to be done safely. The bridge wing wall failed due to a damaged drainage pipe that saturated the soil behind it. It is in an urban location and is next to a watercourse. The levels in the River Isla and the groundwater levels all have to be considered to ensure that the work is done properly and safely for all concerned.
Motions, questions and votes
Linked from this item of the Official ReportIn this meeting
Everything on 6 Feb 2025 →- General Question Time Questions · 1
- Health and Social Care Reform Questions · 7
- National Health Service (Dumfries and Galloway) Questions · 8
- Budget 2025-26 (Hospice Care) Questions · 8
- Rape Crisis Scotland Guidance Questions · 4
- Bereavement Education (Schools) Questions · 4
- Police Scotland (Non-criminal Complaints) Questions · 5
- HMP Glasgow First Minister’s Questions · 18
- Nuclear Energy First Minister’s Questions · 10
- Temporary Rent Protections (Extension) First Minister’s Questions · 5
- The Promise First Minister’s Questions · 8
- Rosebank and Jackdaw Oil Fields First Minister’s Questions · 6
- Clinical Radiologists First Minister’s Questions · 7
- Grangemouth Refinery (Redundancies) First Minister’s Questions · 2
- Flotation Energy (Contract Award) First Minister’s Questions · 3
- Community Right to Buy (North Queensferry) First Minister’s Questions · 2
- Jacqueline McQuillan (Fatal Accident Inquiry) First Minister’s Questions · 2
- Violence in Schools First Minister’s Questions · 2
- Cumbernauld Theatre (Funding) First Minister’s Questions · 2
- Robot-assisted Surgery First Minister’s Questions · 4
- Alcohol Use Disorder in the Justice System Members’ business · 10
- Net Zero and Energy, and Transport Questions · 1
- Bus Patronage (South Lanarkshire) Questions · 9
- A96 Dualling (Compensation) Questions · 4
- A737 (Assessment) Questions · 4
- Grangemouth Refinery Questions · 12
- Speed Limits (Mid Scotland and Fife) Questions · 4
- Union Bridge (Petition) Questions · 7
- Storm Éowyn Questions · 10
- Post-school Education and Skills Funding Body Landscape Statement · 33
- Miscarriage Care Debate · 37
- Great British Energy Bill Bill debate · 49
- Decision Time Decision time · 6
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.