It is a pleasure to be back at the committee. I miss coming along, so it is great to be able to come back.
As you are aware, the committee last looked at the petition in November and, since then, there have been some positive developments, most notably that, at a recent full council meeting, Glasgow City Council agreed a motion to look at the future of the M8 and investigate options for mitigating its impact.
Some colleagues might think that the statement about removing the M8 in its entirety is quite provocative, but it is merely a provocation to a wider discussion. We are talking about a large piece of land in the centre of Glasgow that incorporates the equivalent of the entirety of Inverness city centre, and it can still be used as a road for its primary function. However, the purpose of the petition is to investigate how we reduce the rather obnoxious design of the road to address its spatial and environmental impacts on the city centre.
A substantial amount of work has already been done on that. Most notably, a levelling-up fund bid was submitted to cap the section of motorway in front of the Mitchell library, between Bath Street and Sauchiehall Street. Unfortunately, that bid was unsuccessful, but it may well be revisited in a future round of the fund.
Furthermore, work on district regeneration frameworks was commissioned in 2016. That has produced a series of district regeneration frameworks for the entirety of the city centre. It highlighted interventions, particularly on the west flank of the M8 inner ring road, that could be enabled to reduce the impacts of the road, such as removing certain slip roads; capping and decking over sections of the motorway where it is in cutting; and restoring areas such as Anderston Cross, which is completely engulfed by a kind of spaghetti junction.
There is a large cloverleaf junction at Townhead, which was overengineered—it was designed for the east flank of the outer ring road, which was never actually built. The junction was built by Strathclyde Regional Council in the early 1990s to serve a motorway that was never built. Therefore, it is around one third greater in size than it should be. It incorporates a huge amount of land, which disconnects Royston, Springburn and Sighthill from the city centre.
There are options that, while maintaining the fundamental purpose of the road, could significantly reduce the impact in the short, medium and longer term. Although it is good that there is an indicative proposal from the Scottish Government to work with Glasgow City Council, we need a bit more. Significant public money has already been spent on studies, feasibility and specific interventions. Hundreds of millions of pounds are being spent on repairing the Woodside viaducts—probably the biggest infrastructure spend in the city—which is a reactionary spend that has been subject to no public consultation. It is a reaction to the road physically crumbling apart.