I am very happy to address that issue. Let us go right back. Several years ago, we considered the need to improve the capacity and the performance of the East Kilbride line, and there were a number of options for doing that. We looked at options that included full doubling of the railway as a diesel railway, electrification of the railway, partial doubling—a whole range of options, as you would imagine.
Just to be clear, at no stage was the decision taken that we would proceed with a double-track railway throughout. I think that that has been misreported in some places. At no stage have we—with our colleagues in Network Rail and, indeed, in ScotRail—ever firmly decided that that is the project that we will proceed with. What we have done, as we have gone through a proper analysis of the complex system, is work out the best value-for-money investment on that route. We have also—and I think this is important—taken the opportunity to extend the project to cover electrification of the line as far as Barrhead.
Three key factors took us to the conclusion about the best value-for-money option on the route. The first was, inescapably, the cost of the different options. One thing that we learned in working with the Network Rail project teams on the East Kilbride route was that doubling the full length of that railway would be extremely expensive. The physical constraints and the nature of the geology meant that that turned out to be more expensive than had been hoped when we first started to look at the line. That was just the physical reality on the ground.
The second thing that we did—bear in mind that, when we started, it was not necessarily committed to being an electrification project—mindful of the decarbonisation agenda but also of the superior performance and the lower operating costs of electric trains, was conclude that the railway would benefit from the superior performance, lower costs and improved emissions of electrification. One of the advantages of electric trains is, bluntly, that they go faster, so an electric train occupies a section of track for less time than a diesel train does. One of the problems with the East Kilbride line was that, given that there are some severe gradients on it, at certain times of the year, with heavy loads, the diesels were struggling to keep to time. When we looked at the performance of the electric trains and the cost of the diesel trains, that pointed us in one direction.
The final issue that we had to take into account was the change in travel patterns as a result of the pandemic, which has become manifestly clear, and the use of digital meetings rather than physical meetings. We are seeing a very welcome return of business to the railway as we are emerging from the pandemic, but the nature and the timing of the travel patterns is quite different, so we are not seeing the Monday-to-Friday commuter peak that we used to see. The busiest time that we are seeing now, for example, is on a Saturday rather than on Monday to Friday. Friday afternoons and evenings are also very busy. Therefore, schemes that might have been focused on dealing with the Monday-to-Friday peak-hour traffic for one or two hours now do not look like the priority, because we are not seeing that level of peak traffic, but schemes that help us to address the environmentally sustainable movement of people in a more cost-effective manner through electrification come much higher up the agenda. That is true, by the way, across the entire rail investment portfolio.
After that analysis, the decision was taken to electrify the railway all the way through to Barrhead and to East Kilbride and to invest significantly in the upgrade of Hairmyres as a public transport interchange with stronger bus and active travel links as a park-and-ride site. The last bit of scope to be determined is the extent of the loop that we will put in at Hairmyres. I expect that we will reach a sensible conclusion on that shortly, which will get us the same outcomes for a usefully lower cost.