Parliament Workbench
Data: Official Report to 19 Nov 2026

Official Report · Committee

Continued Petitions

Air Traffic Management Strategy Project (PE1804)

Wednesday 4 May 2022 Citizen Participation and Public Petitions Committee About 09:30–10:15 Petitions 70 contributions · 9 speakers

Speakers

Choose an MSP to read only their contributions

The record

70 contributions
Jackson Carlaw Con The Convener · Eastwood
link

Good morning and welcome to the seventh meeting in 2022 of the Citizen Participation and Public Petitions Committee.

We will take evidence for the first item on the agenda, which is consideration of continued petitions. The first of those is PE1804, which was lodged by Alasdair MacEachen, John Doig and Peter Henderson on behalf of Benbecula community council. The petition calls on the Scottish Parliament to urge the Scottish Government to halt Highlands and Islands Airports Ltd’s air traffic management strategy project and to conduct an independent assessment of the decisions and decision-making process of the ATMS project. We last considered the petition on 2 February, when we agreed to write to the Civil Aviation Authority and to hear evidence from the petitioners and Prospect at this meeting, and from HIAL at our meeting on 18 May.

I am delighted that we are joined by the two representative MSPs—Rhoda Grant and Liam McArthur—who have been following the petition at its various torturous stages of progress through our proceedings. I welcome Peter Henderson, who is joining us virtually and is one of our petitioners who will give evidence.

I will ask members whether they have questions that they would like to explore with Peter. Peter, is there anything that you would like to say before we launch into our questions?

Peter Henderson
link

I still have some concerns that I would like to raise. I do not know whether you would like to hear them. I was hoping that someone from HIAL would be at the meeting to answer my points, but they do not seem to be.

Jackson Carlaw Con The Convener · Eastwood
link

We will move to questions, because that may bring out some of the reservations that you still have. We will see what comes up as we do that. The first question tees that up. What concerns do you have about the agreement between HIAL and the Prospect trade union on the future development of air traffic control? How might those concerns be addressed?

Peter Henderson
link

The first point is that, on page 11 of the digital assurance office’s “Technology Assurance Review, Assurance of Action Plan”, which was published in October 2021, it says:

“It has become evident from the RTS procurement and the SCS RIBA 3 design that the Programme in its current form, exceeds the programme budget”

of £48.4 million. I was hoping that HIAL could explain that, because I think that that is probably what drove it back to the negotiating table, rather than anything that the committee or the petitioners have said.

Jackson Carlaw Con The Convener · Eastwood
link

You want to know whether the change of heart was cost driven rather than being a “Mea culpa, we might have got it wrong” change of heart.

Peter Henderson
link

Basically, I would like to know whether the remote tower procurement process and the design of the remote tower centre at New Century house played a part in the decision to write off the entire programme, rather than anything that we have done. I suspect that that is the truth.

Secondly, HIAL was due to take over the running of the Sumburgh radar from NATS—the national air traffic service—last September. You would think that it is pretty straightforward to transfer an existing radar service into HIAL’s control. It was due to take over in September, then in December, then in April 2022. Nobody now knows when, or whether, it will take over the Sumburgh radar from NATS. The story seems to be that it has recruited nine controllers but has not managed to train them and some of them have left. HIAL might not take over the radar until a year from now, which seems to be a bit disastrous, considering that it wants to have a centralised radar service that is based in Inverness. If it cannot recruit staff for one airport, how can it recruit staff for all the airports and guarantee that it can provide a service? Inverness airport already struggles to provide control; the radar part of it shuts twice a day every day, and probably will do so for a year.

My worry is that, if HIAL centralises all radar services, which airports will it prioritise? Will it prioritise Inverness over all the other airports to make sure that it can provide a service there? Will it shut other airports in order to man Inverness and Sumburgh? I do not believe that it is capable of running a centralised service, which is what it wants to do. It cannot staff, recruit or train for Inverness or Sumburgh at present, so how can it do that for all the airport systems?

Jackson Carlaw Con The Convener · Eastwood
link

I will pause you there. You have looked for an independent assessment. What do you think that that would deliver?

Peter Henderson
link

I think that it would shine a light on the situation. We have a team that has been appointed by HIAL and we have existing HIAL management. It has been exhibited that the ATMS project, which it said was the only way forward, has failed miserably. HIAL still wants to progress an air traffic management system that centralises services. It seems to be failing to do that at the moment. The current management and the teams that are in place do not seem to be able to run that properly. I would like someone from the outside to ask why that is the situation and why there is still a threat to the reliability of our air traffic services.

We do not seem to have progressed. The ATMS still exists in principle. The aims are changing, but HIAL still seems to want to centralise rather than start from scratch and have a proper look at it. None of the project has worked, but HIAL still keeps stumbling on with the same people making the same decisions.

Jackson Carlaw Con The Convener · Eastwood
link

How should HIAL have approached the development of the project in the first place?

Peter Henderson
link

By listening to its staff and the communities, which it refused to do. That is why we brought the matter to the committee and why our politicians, community councils and councils backed us.

HIAL is now engaging with the staff because it was basically forced into that situation. The union, Prospect, is now actively trying to sort out the mess that has happened. However, it seems that a whole new ATMS is being developed without any oversight from anybody outside HIAL, as far as I can see.

Jackson Carlaw Con The Convener · Eastwood
link

It is plain from the subsequent submissions that you have made that concerns were expressed. What was HIAL’s response to and management of those concerns like?

Peter Henderson
link

Initially, HIAL ignored everything and said that the ATMS was the only way forward. There was a sudden change of heart, which I suspect was brought about by budgetary constraints, which meant that it could not achieve anything, and now it is looking for a way out so it decided to negotiate. HIAL has not been honest and open about anything all the way through, as we have found out.

Jackson Carlaw Con The Convener · Eastwood
link

My final question sits on the back of evidence that we have received. What evidence do you have that the Civil Aviation Authority would authorise anything that was unsafe?

Peter Henderson
link

It will not authorise anything that is unsafe, but we were at a meeting with the CAA regulator, who summed up the situation by saying, “If you came to me and said that you wanted to fly a rocket to the moon, I would say that, in principle, that was fine. If you then came back to me with a cardboard rocket, I would turn you down.” HIAL seems to be coming up with a cardboard rocket most of the time.

The CAA will not sign something off until the final phases. It has encouraged HIAL to scope some trials of the surveillance system that it wishes to use. There has been no word on whether HIAL wants to do those trials and foot the bill. It seems to be sitting back and waiting for regulations to change in its favour rather than actively seeking solutions.

The CAA should not sign off anything that is unsafe, but it will wait until the whole project has been decided on and then sign off on whether it will accept it. It does the same with controlled airspace. You can put everything in place, but the final judgment is down to the CAA. If it decides that something is not suitable, it will tell you why and you can then either try to change it or not.

HIAL is trying to operate outwith existing regulations. It is new territory, for which HIAL needs to fund solutions.

David Torrance SNP Kirkcaldy
link

Good morning. How would you like HIAL to involve communities that are served by its airports in the development of future plans and proposals?

Peter Henderson
link

Rather than coming out with a done deal, it needs at least to put out a public consultation in much the same way as other Government departments do. It should say what its aims and goals are and ask the public whether they want to comment on them. A consultation should mean just that: HIAL should listen to what people say and have a conversation with them.

On the islands, we want a good, reliable service that does not let us down. Coming up with ideas that remove all the resilience from our local areas is not good. HIAL just needs to be a little bit more open. It has not been. It just seems to make a decision and expect everybody to go along with it.

David Torrance SNP Kirkcaldy
link

I have one final question—this is your opportunity to raise issues. The committee will take evidence from representatives of HIAL and Prospect. Are there any issues that you would like us to raise with them and, if so, why?

Peter Henderson
link

When the digital assurance office’s assurance of action plan says that the remote tower procurement and RIBA 3 design mean that the programme “exceeds the current budget”, does that mean that two aspects of the entire project cost more than £48.4 million, and is that what drove HIAL back to the negotiating table?

Why is the takeover of Sumburgh radar a mess and way behind schedule? If HIAL cannot take over an existing radar service for an airfield, how can it be expected to run a centralised radar service for all the airfields?

In evidence that HIAL submitted previously, it said:

“None of the petitioners are directly involved in the programme or directly impacted by it”.

However, we are impacted by everything that HIAL does, because we live in the communities that its airports serve. Had we been involved from the beginning and if HIAL had listened to us, which it refuses to do, the programme might not have developed into the mess that it is.

I have a problem with HIAL management still being the same people who are still making the same bad decisions and trying to run a project. I hope that those people have learned their lesson. As Prospect said, I hope that HIAL will work with and listen to the people, rather than continuing with the bull-headed approach that it has taken.

We have achieved an awful lot. The ATMS programme is basically dissolved—there is nothing much left of it, so that has served our purpose. However, I think that it would have failed anyway, purely on cost, without our even intervening.

Jackson Carlaw Con The Convener · Eastwood
link

We will meet HIAL on 18 May, so we will be able to put some of the points that you have raised to it directly. However, we have received strong representation from HIAL that the change is not window dressing and that, whatever the motivation—we can chase that up—it is not simply a cover in order to bring back the proposal that has been set aside in five years’ time. That position is quite robust and clear in the submission from HIAL. As petitioners, do you accept that?

Peter Henderson
link

I had hoped that, because I asked the questions in the way that I did, HIAL would come back in a robust way and make it clear that it would not revisit the issue, because it was still a bit vague. For example, HIAL still wanted to have a remote tower at Inverness, and I could not see the reason for that.

We probably now accept that HIAL will not go ahead with ATMS, as it said. As I said, we have achieved a lot, but most of the programme has collapsed. HIAL still seems to want to have controlled airspace and radar at some of the airports, which is fair enough. It has withdrawn the applications to the Civil Aviation Authority for the airspace changes. When HIAL has redrawn the ATMS proposals, we will find out where it intends to go. However, when it comes up with its plan, I ask it please to make that plan very public, to run it by the communities and to ask for our input and ask us whether we think that it is okay.

Alexander Stewart Con Mid Scotland and Fife
link

You have talked about openness and honesty in the process. It is evident from the concerns that you have raised that the community feels that it has not been listened to and has not had the impact that it wanted in the process. You said that you hope that lessons have been learned. How did the management handle the concerns that were expressed about the proposal initially? Were the proposals completely flawed from the beginning, or were there areas within what was produced that the community might have been open to? Would the community have been willing to participate in the process?

Peter Henderson
link

Basically, every single point that we raised initially was rebutted with the reply that ATMS was the only way forward, and there were no other ways—we were told that, without it, nothing else could be done, so HIAL had to do it. The islands impact assessment was very negative about the effects on all the islands, but HIAL said that all it needed to do was mitigate the effects rather than address the problems. There was constant rebuttal of anything and everything that was said, whether by staff or by MPs and MSPs. It has all been in the newspapers, in the evidence that has been submitted and all over the place. There was then a sudden change.

In relation to ATMS modernisation, it would be extremely useful to have radar or some form of surveillance at the airports, but taking people out of the airports was a step too far. When I worked for HIAL, I can remember me and colleagues laying out our concerns. We would raise safety concerns and be told that it was a matter of opinion, so I left—I could not take it any more. I thought, “They won’t listen. What’s the point?” When there is a culture of not listening, you stop raising concerns, which is a worry.

Even though Benbecula community council did an extremely good thing, there is no word yet on whether Benbecula air traffic control will continue. The story seems to be that it will, which it should, and the same is true of Wick air traffic control, but we need something concrete about that.

Alexander Stewart Con Mid Scotland and Fife
link

You mentioned the opportunities that the community has had. The community ought to be congratulated on its endeavours, because it has highlighted the issue. You have worked with politicians and other groups in the community to ensure that the issue has been kept live. That is to your credit.

What do you want to be done differently? What do you want HIAL to try to achieve with its proposals for the future?

Peter Henderson
link

Basically, there has been an outcry, with people asking why there cannot be people who live in the communities on the boards of organisations such as HIAL and CalMac Ferries. If you have people who live in the community, interact with it and get feedback from it, as is the case with MSPs and MPs, it is possible to feed in directly to them. People who are remote do not understand what we are going through.

All the airports are run as individual airports, but HIAL needs to get some feedback from the customers—if it decides to make a change, it needs to examine whether that change will be for the better or the worse. It is difficult to say how it should go about doing that, but it could put the issue in the local papers or make some sort of announcement.

All I know is that, with everything that it has done, HIAL’s approach has been simply to stonewall. Its attitude has been, “We’re doing this and we don’t care what you say.” Often, the people who work at the airport, who live in the community, are the best measure of what the community feeling is. HIAL just needs to listen to what its staff say, and I fear that it still does not do that.

I could go to my airport manager and say, “This is all a complete shambles”; in fact, at Kirkwall, we got the board members in, talked to them directly and said, “This will never work as you want it to—it’s a mess.” Their response was, “Yeah, yeah—we’ll look into it,” and they continued anyway. What are you meant to do?

Fergus Ewing SNP Inverness and Nairn
link

Good morning, Mr Henderson. I joined the committee only recently, so please forgive me if this question covers ground that might already have been covered in the history of the petition thus far. You are asking for an independent assessment to be carried out. Who do you think could conduct such an assessment? How might that person or persons be appointed?

I ask because it seems to me that the Civil Aviation Authority has the role of conducting a proper assessment of any proposal. Given that it is the statutory body that is charged with the responsibility of regulating air safety in the United Kingdom, and given the critical importance of that function, it is not immediately obvious to me who else could be expected to carry out an assessment of a system that, at the end of the day, is designed to protect people against air accidents, which would almost certainly result in fatalities. I would like to get a sense of how, in practice, an independent assessment could be carried out and who could do it.

Peter Henderson
link

The CAA oversees rules and regulations regarding aviation, so when it comes to safety it is the ultimate arbiter. When it comes to throwing money at a project that was never going to work, which is funded by the taxpayer, is damaging to communities and is run by an organisation that refused to listen to the concerns of its own staff, I suspect that somebody in the Government—because the Government and Transport Scotland fund HIAL—needs to look at how decisions on services that are provided at airports are made and at the ideas that are bandied about.

There is an aviation safety aspect to everything that HIAL comes up with, but to centralise staff to Inverness and to decide to take over an existing radar contract from NATS at Sumburgh, which has run reliably for decades, only to find that it cannot even staff it so that the contract is a year behind schedule, are managerial tasks that seem badly handled.

Ultimately, the HIAL board is meant to examine the management of HIAL and pull them up on mistakes that they have made. However, the HIAL board obviously just rubber-stamps stuff, as it has done all along. It does not seem to understand the things on which it signs off. Is there not a Government—

Fergus Ewing SNP Inverness and Nairn
link

I am sorry to interrupt. I got the gist of that—it is more a question about the financial and managerial aspects of how HIAL has failed thus far, as you see it. To be clear, in your view, should it be somebody in the Scottish Government who carries out that independent assessment?

Peter Henderson
link

I believe so, because £9 million have been chucked down the drain on something that we said all along would not work in the way that HIAL wanted it to work, but we were basically told, “It’s the only way—it’s my way or the highway.” That is not a way to run an organisation.

Jackson Carlaw Con The Convener · Eastwood
link

That has been very helpful. I thank you for your persistence in pursuing the petition.

We will see HIAL on 18 May, so we will be able to pursue some of your specific questions with the organisation then. I thank you for your time this morning, Mr Henderson.

09:57 Meeting suspended.

09:58 On resuming—

Jackson Carlaw Con The Convener · Eastwood
link

Welcome back. We move to our second witness on PE1804, on HIAL’s plans. I am delighted to welcome David Avery, from Prospect, whose name has been referred to and brought up numerous times in our deliberations. You are very welcome to the meeting.

We have read Prospect’s most recent response to events in our papers ahead of this morning’s session, so we will move straight to questions.

Paul Sweeney Lab Glasgow
link

Welcome to the committee, Mr Avery, and thanks for the submission on behalf of your members in HIAL. How confident are you that the arrangements for the development of a new air traffic control strategy will produce results that are acceptable to your members in HIAL?

10:00

David Avery Prospect
link

I am reasonably confident that the new direction is far more palatable than where we were before. It was not our members’ preferred choice—they would have preferred local deployment—but the new direction has achieved all our goals around protecting local jobs and preventing the downgrade of two airports. We have been given assurances that that will be the case for at least five years. If we consider that HIAL is a Government body, which is subject to ministerial direction, five years is a reasonable guarantee of no change.

On whether HIAL is able to deliver, I hope that it is better able to deliver this system than the previous one. This system replicates the one that HIAL has had in Sumburgh for decades. It involves established technology and procedures; the remote tower project proposed by HIAL did not. This system is far simpler and far more likely to be delivered. That is still not easy, but the system has a better chance of delivery than HIAL’s previous proposals.

Paul Sweeney Lab Glasgow
link

In your submission to the committee of 7 March, you said that working groups on the future of air traffic control, particularly at Wick and Benbecula, were yet to be established. Has there been any progress on that? Would you like to see that happen? Is there a need for that?

David Avery Prospect
link

I am pleased to confirm that the working groups have not been set up because they have not been needed. The company has given us the same assurance for both airports that there will be no downgrade of service for at least five years, at which point there will be a review. The review will look at the issue with an open mind, rather than with an aim to justify a decision. Again, that is the goal that members have been seeking.

The airports are not the same—they have very different communities and needs. There will be two separate reviews, because the long-term solutions for the two airports will not necessarily be the same.

Jackson Carlaw Con The Convener · Eastwood
link

When was the change of view in relation to Benbecula confirmed? That is quite recent and not something that we were aware of from our papers.

David Avery Prospect
link

It was subsequent to the last submission that was made. I do not have the exact date. I think that the Benbecula one may have been about four weeks ago and the Wick one is very recent—within the past week.

Paul Sweeney Lab Glasgow
link

The main consideration for a lot of people in relation to the changes has been aviation safety. What is your union’s position on the implications of the changes in air traffic control for aviation safety?

David Avery Prospect
link

Our view has always been that radar is a welcome improvement. It is a vital safety tool for any controlled airspace with any scheduled commercial traffic. It will provide an improved safety service and, potentially, open up markets to other airlines that are not prepared to fly without radar. We see all of that as a positive. Controlled airspace is welcome, too. There is acceptance that, were those two things to be done, procedural control could be phased out. That is not something that members are opposed to, assuming that it is done safely and in the right way.

There has always been the aim to seek to make safety improvements. Where we disagreed was on how HIAL was intending to do that and, ultimately, whether remote towers would bring their own set of problems with them.

Fergus Ewing SNP Inverness and Nairn
link

Good morning, Mr Avery. Can any lessons be learned by HIAL about the way in which it has handled the whole thing?

David Avery Prospect
link

Absolutely. I hope that HIAL and, indeed, other organisations have learned lessons about the involvement of staff and communities, and being more sceptical of consultants. I have been very critical of the fact that HIAL kicked off the project without public consultation. There was very little staff consultation—frankly, the views of staff were disregarded. The justification for the case was based on the report of one consultant, and that was not the direction in which the rest of the industry was moving. No major remote towers, in the way that HIAL intended to do them, have been announced anywhere else in the UK in the past five years. HIAL’s original view was that it was at the bow wave of a tide of change, but that is clearly not the case.

The project has never been subject to public consultation. It involved a major change in the service and in the way that air traffic would be delivered.

I think that there still should be change, but the time to do that would be at the point at which the Transport Scotland infrastructure board has approved the case.

Fergus Ewing SNP Inverness and Nairn
link

As I said earlier, the petition has quite a long history. I have only recently become a member of the committee, but I have been aware of, and have followed, matters. It is plain that progress has been made, partly as a result of the work that Prospect has done and the engagement from MSPs and the petitioners. Do you feel that that progress has covered some of the defects—as you see them—that you have just described? In other words, are you confident that, going into the future, HIAL will listen more to staff and engage more with communities? As I understand it, you have been in the thick of it.

David Avery Prospect
link

I hope that that will be the case. HIAL is involving staff far more in the current phase of the project. I am not sighted on community engagement in particular. Currently, the work is of a pretty technical nature rather than the kind of work that we would want to take out to communities for discussion, but that will come in the future. In particular, communities would rightly want to have a view on questions around schedules, deployment, staffing levels and opening hours.

Fergus Ewing SNP Inverness and Nairn
link

Yes. Those issues are hugely important to all the islands that are served by HIAL with what are, in many cases, lifeline services.

What about the financial side? Do you have an idea of how much HIAL has spent on the now-aborted air traffic management strategy?

David Avery Prospect
link

No more than what is in the public domain. The papers that I see do not include commercial in confidence numbers, and I would not be able to discuss those. I would suggest that that question needs to be put to HIAL.

Fergus Ewing SNP Inverness and Nairn
link

Okay. Do you think that those figures should be made public, or are there good reasons why that should not be the case?

David Avery Prospect
link

It is not for me or the union to say whether they should or should not be. It is a public project, and there has been significant expenditure on it, so it is worth looking into some of the decisions that have taken us to this point. That would include the costs incurred.

Fergus Ewing SNP Inverness and Nairn
link

We heard earlier from one of the petitioners, who confirmed that he felt that the Scottish Government should take charge of an independent analysis. That surprised me a little, because I had thought that he had perhaps envisaged an individual analysis that was independent of not only HIAL but the Scottish Government. Be that as it may, if you think that the project should be analysed and that the costs incurred to date should be studied, do you have an idea of who the right person or the right body to do that work would be?

David Avery Prospect
link

I have thought about that only recently, having listened to Peter Henderson’s evidence. My view is that it should probably be Audit Scotland. You do not need to be an aviation expert to look at the problems in the project. I am not an aviation expert—professionally, I am a scientist—but I have learned a lot, having dealt with the project for five years. Advice on specialist issues relating to information technology, air traffic engineering, air traffic control and so on can be sought from various learned sources. The questions around decision making, finance, confidence and risk and management of risk are the types of questions that Audit Scotland is professionally able to deal with.

Fergus Ewing SNP Inverness and Nairn
link

That is very helpful. If you have further thoughts after the meeting, given that these questions are being sprung on you, we would be very keen to receive them.

Alexander Stewart Con Mid Scotland and Fife
link

Mr Avery, you have talked about the lack of communication and consultation with staff and communities in the whole process. How are industrial relations progressing? What impact has the handling of the whole affair had on industrial relations between HIAL and Prospect?

David Avery Prospect
link

HIAL is very different from almost any of the organisations that I deal with, and it always has been. I have been involved with it for seven years, so I was involved with it for a significant time before the project began. My predecessor, who had dealt with HIAL for far longer, expressed the same view. It is the only air navigation service provider that is run under public ownership in that manner, so its situation is not analogous to that of Prestwick or NATS, which are run as private companies. HIAL is run as a public body, but it is not like any of the other public bodies, because it has significant commercial elements and highly operational staff. Its aim is to achieve service delivery in a way that most other public bodies do not seek to do. HIAL was already a difficult company to deal with because of those challenges.

Industrial relations have been strained, but we have never fallen out or stopped talking—we have always had good discussions, even through the industrial action periods. I hope that, given the new engagement with staff, there will be more staff involvement in decision making, not just within air traffic but across the board in HIAL.

Alexander Stewart Con Mid Scotland and Fife
link

You talked about lessons being learned in the process. It is vital that lessons be learned about how to manage the staff and industrial relations in the future. What would you like HIAL to try to achieve to ensure that that becomes a reality?

David Avery Prospect
link

I would like HIAL to involve its staff at whatever level whenever it makes any decisions that relate to staffing or service delivery. Whether the decision is about a change of opening hours, a change in a security protocol or something big, such as air traffic control changes, the staff who are involved in the delivery of the service should be involved in it. I would also like the communities to be involved and things not just to be sprung on them as what HIAL is now going to do. I hope that that change will happen, but HIAL is a large and difficult organisation because of the disparate nature of multiple airports, so it will not happen overnight.

Jackson Carlaw Con The Convener · Eastwood
link

Mr Avery, we explored with the previous witness what has brought about the change of view in HIAL. He was sceptical that it was our investigation into the matters, our representations or your representations, and he thought that it was all down to a realisation that the costs involved in the project were no longer sustainable. What do you think the cornerstone of HIAL’s change of approach is?

David Avery Prospect
link

I have to say that I was not inclined to look a gift horse in the mouth and question HIAL’s motivations when it came to us for a discussion on a more positive note, given the previous five years, in which there had been no discussion about the strategic direction.

It is probably not one thing. I hope that the HIAL board’s view on why a change of direction was necessary was not down to any one factor. I think that it was the result of a combination of the committee’s work, the industrial action from staff, the islands impact assessment, the constant negative stories about HIAL—it was struggling to get any positive media coverage about other things that it was doing because the matter was driving them out—costs, and the fact that the project was still not going anywhere. Ultimately, it is very hard to implement such a project without the buy-in of staff.

Jackson Carlaw Con The Convener · Eastwood
link

I invite our two parliamentary colleagues who have joined us and have been with us at various stages during our consideration of the petition over an extended period to ask you anything.

Rhoda Grant Lab Highlands and Islands
link

Thank you, convener. I have a question for clarification. Prospect has worked well on the matter and I am pleased that we are where we are and are making progress. We talked about replicating the Sumburgh service. Peter Henderson, the petitioner, had some concerns about what might happen in Sumburgh with radar being centralised to Inverness. Does that have staffing implications and do you see issues with it?

David Avery Prospect
link

As Peter Henderson said, HIAL has hired staff in Inverness who are working on delivering the radar service for Sumburgh. It is being delivered as a so-called greenfield radar—as if it had not existed before. HIAL is not transferring any staff or procedures from NATS: it is being done almost from scratch. That is not an easy thing to do, so the regulator is rightly taking a significant interest. HIAL might well need more staff than it has. It will take as long as it takes.

The proposal is a far more achievable prospect than the previous remote-towers proposition and at least replicates something that HIAL has already done. The controllers at Sumburgh do not have to learn new procedures; they are handing over to another provider—this time, in Inverness rather than Aberdeen—but there will not be a significant change for them. That is far easier to manage than what would have happened had HIAL centralised the tower and the radar.

Rhoda Grant Lab Highlands and Islands
link

NATS currently operates the radar service for Sumburgh from Aberdeen. Is that right? No one is based in Sumburgh; there are no job implications for Shetland.

David Avery Prospect
link

There are no job implications at all—the roles of the staff in Sumburgh will remain as they are. As I understand it, the roles in Aberdeen can be redeployed to other work in NATS—it has other work that it would like the staff to move on to when the HIAL contract ends.

10:15

Liam McArthur LD Orkney Islands
link

I will make a couple of observations before I turn to the issue on which Rhoda Grant was pressing Mr Avery.

I still cannot get my head round the fact that we were told for years by HIAL management that its air traffic management strategy project was the only show in town and the only credible option. It has backed off from that much later in the day than I and many others hoped it would. Mr Avery’s assessment that that is the result of a number of factors is probably fair, but the cost and delivery of the project were always seriously under question, which might well have driven HIAL back to the negotiating table.

However, there has been no reckoning with those who marched us up that hill then marched us back down again. The earlier point about Audit Scotland casting its eyes over the matter seems to be entirely sensible and reasonable. The cost is one component; another aspect is how decisions were made. The cost to the public purse is a real concern. I have had discussions with Audit Scotland, which suggested that that is more a matter for Transport Scotland to deal with. However, in a sense, Transport Scotland has skin in the game, given its responsibility for HIAL. I am keen to understand the extent to which Audit Scotland could provide satisfaction that due process was followed and that public money was not needlessly wasted, as appears to have been the case.

On centralising radar, which Mr Henderson mentioned and Rhoda Grant pursued just now, similar concerns, although they are a little different, are now being raised. Mr Henderson spoke about those concerns. The issue seems to fall into the same category—that is, it concerns a review or a decision that has been predetermined. Although it appears to be consulting more, HIAL is asking how to deliver what it has already determined that it will deliver. I wonder whether work needs to be done to get HIAL almost to go back to first principles.

HIAL might have delivered on that, but the matter is not completely alien to it. If the concerns that Mr Henderson raised are legitimate—they seem to be borne out by evidence—I would hope that the committee and Prospect, in its discussions with HIAL, might be able to persuade HIAL to go back to first principles and determine whether a centralised model for radar surveillance is more practicable and in the interests of the island communities that rely on the lifeline services. Does Mr Avery agree with that? Might Prospect be able to carry forward that approach in its negotiations?

David Avery Prospect
link

The preferred model of our members was local deployment, but they have agreed to a remote system from Inverness. You need to bear it in mind that I am not a controller, but my understanding of the technical feasibility of delivering radar from Inverness and delivering radar from a room downstairs in Sumburgh tower is that they are not wildly different. The questions that you would have to ask are around procedure; validation of staff and training are largely the same. The challenges that HIAL would face doing a greenfield radar implementation on site—whether at Sumburgh or at any other airport—versus doing it remotely are the same.

Prospect, as a union, does not have a particular view about whether the associated jobs would be better based in Inverness or in Sumburgh—or, indeed, in Aberdeen, where they are currently based. There are Prospect members in all those areas; I would not want to speculate about which option was better than another.

I highlight that the greenfield radar application is genuinely a difficult thing to do. HIAL currently has only one radar base, which is at Inverness airport. Inverness is short staffed and cannot share the experience of those controllers in the project. Delivering the service is not easy, but that is a far more doable challenge than the one that HIAL previously embarked on. I do not take a view on the jobs question.

I will expand on the point about Audit Scotland. My previous industrial relations work involved the creation of Marine Scotland. Audit Scotland audited that when it was finished. That provided insights into lessons that can be learned from machinery-of-government changes. Audit Scotland is probably the appropriate body to look at the matter. As Liam McArthur said, Transport Scotland is involved in decision making in HIAL; it sits on the board and will, ultimately, sign off—or not—the changes to the project. I am not sure that it is in a position to audit itself.

Jackson Carlaw Con The Convener · Eastwood
link

Does Prospect retain confidence in HIAL and its existing board?

David Avery Prospect
link

We have never put to our members the question whether they have confidence in HIAL’s board, and I do not want to speculate on how they would vote, were we to do so.

Jackson Carlaw Con The Convener · Eastwood
link

That is one gift horse that you are prepared to look in the mouth. Thank you very much. That has been extremely useful and helpful.

Colleagues, I think that we will probably consider the evidence afresh after we have met HIAL. Liam McArthur made general comments in addition to the points that we put to Mr Avery. Rhoda Grant asked a specific question. Do you have general comments to add for us to bear in mind before I draw the discussion to an end?

Rhoda Grant Lab Highlands and Islands
link

I have a comment about community involvement. I have spoken to Prospect members and the like. They seem to be happier with their current involvement, but we have heard from Peter Henderson that he is concerned about community involvement. He is representing the community—albeit that he is doing so as a previous employee of HIAL. We need to get everybody on side. The issue is so important that we must ensure that, whatever comes from the discussions, there is buy-in from everyone, and that they all have confidence in the system that will be put in place.

Liam McArthur LD Orkney Islands
link

I will make a final point to follow up what David Avery said about not having a particular concern about where radar surveillance jobs are based. I understand that, and that the primary concerns are that jobs are secure and well paid, and that training is in place. As representatives of the various communities that HIAL serves, we have an interest in where the jobs are based. If there are not overwhelming arguments for their being based centrally as is proposed, rather than being dispersed round the network, HIAL needs to explain why that is happening. The expectation should be that, as far as possible, HIAL and other public bodies disperse jobs around the region. Peter Henderson has also set out real concerns about the practicability of what is proposed.

Jackson Carlaw Con The Convener · Eastwood
link

As that flag has been run up the mast, I will draw this evidence session to a conclusion. Thank you all very much. I suspend the meeting briefly.

10:22 Meeting suspended.

10:27 On resuming—

  1. 09:30 Continued Petitions Petitions · 70
  2. 10:30 Continued Petitions Petitions · 7
  3. 10:30 Continued Petitions Petitions · 1
  4. 10:30 Continued Petitions Petitions · 8
  5. 10:30 Continued Petitions Petitions · 3
  6. 10:30 Continued Petitions Petitions · 3
  7. 10:45 Continued Petitions Petitions · 1
  8. 10:45 Continued Petitions Petitions · 3
  9. 10:45 Continued Petitions Petitions · 10
  10. 11:00 New Petitions Petitions · 5
  11. 11:00 New Petitions Petitions · 5

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.