The energy efficiency measures are largely the same as those normally used. We have insulated the loft and the ground floor a lot; we have put external wall insulation on the back of the building, as you will have seen; and insulation has been put on the inside of the street-facing walls.
However, there are two differences with the insulation measures that we have put in. First, we have closed up the gaps. Broadly speaking, in conventional work, what gets done are the easier bits, not the difficult bits—that is, where the roof meets the wall or where the wall meets the floor. Those are the places where you often cannot get the insulation to join. Everybody is sick of me using this analogy, but it is like having holes in a bucket; you used to have 10 holes and now you might have six. In other words, you might think that you have improved things, but the reality is that the heat still moves out of the building.
Our job with regard to Passivhaus is to close up all of those holes, with more effort taken with messing about in the corners of things and with the things that are tricky to do. A good example would be what happens with first-floor joists. However, it also shows how difficult it is to make this project representative and why we need a broader strategic approach, because it would be very difficult for someone to do what we do if they did not own the flat above or below theirs. We do not stop insulating at the floor and the ceiling; instead, we take the insulation up through the ceiling and down through the floor to ensure that all the gaps are filled. That cannot always be done, but it has to happen, because either the heat gets lost or the moisture can get out of the building and into the walls.
The second difference is that we are concerned about the risks associated with internal wall insulation. This is a little bit technical, but a difference between our project and others is that we have tested what would happen with moisture in the stone walls and have found a high likelihood of there being excessive moisture, which would lead to the timber lintels over the windows and the timber floor joists decaying. As a result, we have gone to extra trouble and cost by using vapour-permeable wood fibre insulation and designing things in such a way that that situation should not happen. That sort of thing is not normally done, but our expectation is that we will not get rotten floor joists or rotten timber lintels. That will be an issue in the future with regard to retrofit.
We use triple glazing, but that is not particularly unusual; it just means that windows are heavier, which can be an issue. We have used NVHR units, which involve heat recovery ventilation—it is a bit of a faff but is fundamentally not that difficult.
Therefore, for the most part, it is the same as other renovations, but with more insulation, more care taken at the corners and an unusual solution to the internal wall insulation, because of the moisture and health issue.