No, and I do not accept your characterisation of what has been done as involving very little work. That would be a gross misrepresentation of the work that has been undertaken since the incident occurred last March. My officials can give you some details of the nature of that work and the challenges around identifying the conditions in which issues with ice tend to occur.
Those who have suggested that, from now on, we will experience the same problem whenever it snows are factually wrong. It has happened on two occasions. During adverse weather periods such as the beast from the east, and during other periods of snow, there have been no such problems. Part of the challenge with what happened last March was that icing was not expected to take place. After the vehicles were damaged last year, the engineers faced a challenge in seeking to identify exactly where the ice had come from. Three possible areas were identified: the towers, the cables and the overhead gantries.
As the incident happened in a very short period of time, the engineers were unable to identify exactly where the ice had accumulated and fallen from. They thought that it had come largely from the towers as the principal source. However, their understanding of the weather at that time and the impact that it had on the bridge was limited—they did not have a data set to show that, if circumstances of a particular nature bring together a certain range of factors, the likelihood of icing is greater. Their level of knowledge on what had led to that particular incident was very limited.
The engineers sought technical expert advice on the matter, including international advice relating to other bridges that had experienced similar problems and the measures that had been taken. That work, which included hosting a conference to bring together experts in the field to explore what could be done to address the issue, was completed in October last year. The actions that were recommended as a result have already begun to be taken forward. The specifications for the weather-sensor equipment have been developed and tested, alongside the additional weather forecasting measures that have been put in place. In addition, this winter, we introduced a visual inspection regime that is to be put in place during periods of adverse weather. The bit that takes longer is the technical aspect, given the technical nature of the ice sensors and the way in which they have to be installed on the bridge.
A significant level of work has been undertaken. I refute any suggestion that nothing, or very little, has been done since March last year; that would be a gross misinterpretation of the work that has been undertaken. I highlight the challenging nature of that work, in which the engineers have had to try to pinpoint where the ice is coming from and the circumstances in which it occurs, as it develops only in certain circumstances. Mark Arndt may want to say a bit more about the work that has been done over the past year and the specific challenges associated with the very limited weather environment in which the issue starts to occur.