We do not necessarily need 40 chargers. We need to look at the capacity and capability of the chargers, but we also need to consider hard behavioural change. One of the key things that we need to look at is how we ensure that people do not hog the chargers and that they are reused by people on those streets.
One of the big challenges for urban environments, in particular, is reducing the level of congestion on our streets. It is as important for me that everybody has universal access, not just those who own a car. Let us not ignore those who rely on our transport system. The issue is not just about the cars that are parked on the streets.
Two weeks ago, we delivered to the Caledonia depot the first electric bus in the Glasgow area. There are 365 buses using that depot, which is right in the heart of the Gorbals. The first bus route that we delivered goes through Possil and Springburn, which are among the poorest and most deprived areas in the city, so it will be an important public transport artery in those local economies. Those 365 buses will require anything between 100kW and 280kW chargers, which will create 8MW to 16MW of demand on a network that currently has 2MW of demand. We can deliver the capacity for that bus depot to operate, but not without an anticipatory investment mechanism in place.
I draw your attention to the Infrastructure Commission for Scotland’s key findings report, “A blueprint for Scotland”, which Stephen Vere referred to. It said that, by 2021, the Scottish and United Kingdom Governments should develop an appropriately devolved regulatory framework—one that does not just go at the average pace of the UK but really recognises Scotland’s ambition. That is an important point, as we are running ahead of other parts of the UK. The report also says:
“By 2022, the Scottish Government, local authorities, regulators and industry should work together to establish ... incentivisation mechanisms and a route map for the transition to net zero”.
That concept of integration in our planning is vital, as is the need for the regulatory frameworks to move at pace.
The electric vehicle energy task force highlighted the urgent need for the Government and Ofgem to
“facilitate effective ... planning and coordination of the rollout of EV and electricity network infrastructure at a national and local level”.
The type of work that we are doing with the two local authorities that I mentioned is unique in the UK; no other network operator is doing it. We are doing it for the UK in conjunction with colleagues at Scottish and Southern Electricity Networks. We are dealing with not just the urban issues but the e-tourism issues. If we look at Portree, we see that its population can treble or quadruple in summer. People will also need access to charging infrastructure in island and rural environments. That is vital for our economy as a whole.