As members probably know, there is an existing legislative requirement for Scottish ministers to prescribe the equipment that can be used for electronic monitoring. We are obliged to specify that equipment in a Scottish statutory instrument as one of the stages of parliamentary oversight of the electronic monitoring service. In practice, we discharge the obligation by setting out in regulations a brief description, with, as members can see, the model numbers and equipment that can be used.
We always intended to produce regulations in January 2020 as a result of the introduction of new equipment in the forthcoming new electronic monitoring contract. This was a planned stage in preparation for the five-year contractual period. Before Christmas, however, we had to move to prescribe equipment faster than we had initially planned to, and we brought forward the regulations in breach of the 28-day rule. That was driven by the increased number of court orders that G4S was receiving for which there had to be electronic monitoring. At the time, we saw the highest level that we had ever seen in Scotland of electronically monitored court orders, such that, even with the decrease in the number of home detention curfew licences, which are monitored, there was potential pressure on equipment stock levels.
Our acting to prescribe a broader range of equipment meant that the stocks of new equipment that G4S had ready and waiting to deploy for the new contract would be used earlier, in conjunction with the current equipment. We believe that acting to prescribe that equipment was necessary and that it was a prudent contingency to ensure continuity in this important service, particularly in light of recent changes to HDC.
The regulations have no impact on the move towards the introduction of GPS. They do not enable any equipment to be used for GPS at this stage; rather, they allow for a slightly updated set of home monitoring units and tags with different model numbers to be deployed to carry out the same radio frequency monitoring that already takes place.
As the convener said, the regulations are subject to the negative procedure, which requires an instrument to be laid before Parliament at least 28 days before it comes into force. In order to bring the regulations into force ahead of the Christmas recess, we had to breach the required 28-day period. There is precedent for such an approach to be taken where there is a pressing reason for it. Of course, a breach of the 28-day rule does not affect the validity of the regulations, and the committee has a 40-day period in which it can annul them.
We wrote to the Presiding Officer to explain why we were unable to lay the regulations 28 days prior to their coming into force and, as I said, we informed the committee. I am more than happy to take questions from committee members on the regulations.
12:15