The next new petition that we will take evidence on is PE1653, on active travel infrastructure, by Michaela Jackson on behalf of Gorebridge Community Development Trust. This morning, we are joined by Michaela Jackson, who is accompanied by Dave du Feu and David French, who are both members of Spokes, which is a cycling campaigning group in Lothian. I welcome you all to the meeting and invite Michaela to make an opening statement of up to five minutes, following which we will move to questions from the committee. I also welcome Christine Grahame MSP, who has an interest in the petition.
Official Report · Committee
New Petitions
Active Travel Infrastructure Strategy (PE1653)
Speakers
Choose an MSP to read only their contributions- Michaela Jackson 14
- Dave du Feu Spokes 12
- Johann Lamont Lab 8
- Rona Mackay SNP 5
- Angus MacDonald SNP 5
- David French Spokes 4
- Maurice Corry Con 4
- Christine Grahame SNP 3
- Brian Whittle Con 2
The record
57 contributionsThank you very much for having us this morning. I am joined by Dave du Feu, who will talk about policy issues, and David French, who will help me to present and will talk about the issues with option B for the Sheriffhall roundabout.
I started the petition when it became clear that the option that had been chosen for the Sheriffhall roundabout was the worst option with regards to accessibility for pedestrians and cyclists. The issues extend to broader transport policy because the chosen option is at odds with two key Scottish Government policy objectives. The first is CAPS—the cycling action plan for Scotland—which was initiated in 2010 with a vision that 10 per cent of all journeys in Scotland would be taken by bicycle. A recent review has indicated that there has only been a 0.2 per cent increase in cycling journeys. At that rate, it would take more than 300 years to reach the 10 per cent cycling goal. It is clear that, at present, transport policy does not integrate cycling or active travel enough: cycling and active travel have to be central to policy, rather than add-ons at the end.
The second Scottish policy objective that option B is at odds with is climate change. Scotland has really ambitious CO2 emissions reduction targets, but when I read through the environmental analysis report for the Sheriffhall roundabout, I was surprised to see that climate change was not really considered with regard to how the construction was to be implemented. The key considerations were the actual environment and journey saving times.
We need to look at how what we build impacts users. If we build for traffic and cars, we will get more traffic and cars; if we build for people and places, we will get more people and better places. I ask that active travel be not an add-on, but absolutely integral to any new transport infrastructure, especially in relation to trunk roads in key commuting areas.
I will spend two minutes outlining policy issues.
As Michaela said, the Government’s preferred option B for Sheriffhall is the worst option for cycling and walking. It will make it impossible to include a direct pedestrian/cycle bridge and it has numerous slip-road crossings. The Government’s option B announcement did not even mention cycling.
In its report “Strategic Cross-Boundary Cycle Development”, the regional transport authority SEStran—the south east of Scotland transport partnership—identified the importance of having a bridge at Sheriffhall if there is to be high-quality cycling provision. Sustrans, the Scottish Government’s main partner on cycling infrastructure, stated in a letter to the designers that the option was so poor that it would not comment on the details and instead urged a rethink of the options. Even the Scottish Government, in a letter to Spokes, damned option B with faint praise, saying merely that it is better than the existing arrangements.
In 2004, Scottish ministers allocated £800,000 to Midlothian Council for a cycle bridge at Sheriffhall. Sadly, the cash was subsequently reallocated because, at that time, the roundabout rebuild appeared to be moving up the agenda.
More generally, the Scottish Government has a trunk roads cycling initiative policy, which might particularly interest Mr Whittle and Mr Corry, having been introduced by Lord James Douglas-Hamilton in 1996. It is still current, and it commits the Government to
“give special consideration to cyclists in trunk road improvements,”
“ensure no hazards to cyclists are built in,”
and
“ensure that opportunities for cyclists are exploited.”
However, that policy is clearly breached by choice of option B.
Finally, option B reflects a general issue in respect of treatment of walking and cycling in infrastructure projects, of which I have countless examples: major decisions are taken and only then do designers try to fit in active travel, although good options may by then be impossible. Instead, cycling and walking should be essential criteria from the outset and holistic solutions should be developed. I now pass over to David French.
I will talk briefly about Sheriffhall itself, which is an important road intersection. However, for pedestrians and cyclists it is, equally, an important barrier between Midlothian and Edinburgh. Crossing the current roundabout is not a fun experience, whether you take the pavement and cross the carriageways or cycle round the roundabout. The building of a new roundabout is a great opportunity to fix that and to make active travel between Midlothian and Edinburgh at Sheriffhall an appealing option. However, the proposed design option B does not manage to do that.
As Dave du Feu said, improving safety at Sheriffhall for non-motorised users is not a particularly high bar to clear, but I am not convinced that the proposed design even manages that. The assessment report asserts that safety for non-motorised users will be improved by grade separation, but crossing the slip roads will still be dangerous, especially if the crossings are not signalised. The nearby Straiton junction is already grade separated, but it was recently listed by Sustrans as one of the worst accident spots in the country. We really need segregated routes across the Sheriffhall junction.
Thank you very much. We are obviously interested in the specifics, but we also want to look at the more general issues, so thank you for flagging up some of those. Rona Mackay has a question.
Good morning. Your petition calls for active travel considerations to be incorporated into all new major infrastructure projects. We know that there is disagreement over the extent to which that is already being achieved. Therefore, how we measure the provision and quality of active travel infrastructure is important. Do you have any suggestions for how the provision and quality of such infrastructure can be objectively measured? Are you aware of a widely acknowledged standard or guidance that can be drawn on for that purpose to make comparisons?
I do not know; I am not an expert. However, personally I feel that if I can take my children along a path, it is a safe path for active travel. I do not define myself as a cyclist—I am just trying to get from A to B and to get some exercise into my day—but alone I will take greater risks and travel on busy roads that I would not dream of taking my children on. For me, the benchmark is whether you would take an eight-year old child on the road. I do not know what work Spokes has done.
I do not know the details, but I know that when the Scottish Government—or Transport Scotland—consulted on the options for a Sheriffhall roundabout, Sustrans did a very detailed analysis of the options based on various criteria. We can provide that letter from Sustrans, if that would be helpful.
Did you get an explanation for why option B was chosen over the others?
I have just looked at the assessment report. Different criteria are put into a model called STAG—Scottish transport appraisal guidance. However, the problem with the model is that it extrapolates data from 2014 to 2024, when the roundabout will come into use, and it looks at the impact that that will have on journey times, safety and the local environment. However, I feel that we cannot use models that extrapolate from 2014; we need to look at where we want to be in 2024. We cannot just assume that traffic will increase by 40 per cent. Transport is already the highest contributor to greenhouse gas emissions in Scotland, so we have to look at how to hold that back and how to decrease the level of traffic. We cannot just tinker around the edges of the current system; we need to look at creating a different system that actively supports different methods of getting from A to B. We cannot build that sort of hard measure into our society when we are looking for long-term change.
10:30
Would there be merit in looking to some of the European infrastructures that have been operating for some time, and looking for best practice there?
Undoubtedly, it would. It is not a difficult problem to solve, because lots of other countries have solved it. In Copenhagen, 50 per cent of the people on the streets are on bicycles.
It is also about the level of priority that is given to walking and cycling in decisions. There are the obvious reasons—Michaela Jackson has mentioned climate change and public health, which are obviously important—but we must also remember the Government’s policy and its clear objective for 10 per cent of journeys to be made by bike by 2020. That will now be incredibly difficult to meet, if not impossible, but we at least want to work towards it.
The Government has no policy to increase journeys by car, yet we have decisions being made in which the convenience and time savings of car travel are given much greater priority than walking and cycling are. In the Scottish Government’s overall transport policy, which is in the national transport strategy, there is a very clear statement of its vision for the future of transport, which is of
“a culture in which fewer short journeys are made by car,”
yet here we are taking decisions that are increasing car journeys and making walking and cycling more difficult.
Okay. Thank you.
Good morning. The Scottish Government has published “A Long-term Vision for Active Travel in Scotland 2030”, which includes this aspiration:
“Main roads into town centres all have either segregated cycling provision or high quality direct, safe and pleasant alternatives. Pedestrian and cycle paths are in place. Rural and suburban minor roads have low speed limits, linking nearby communities and services so opening up new travel opportunities and choices.”
Have you had a chance to review that strategy? Do you have any thoughts on the Scottish Government’s vision? I am thinking about whether the policy is integrated and whether it will lead to the desired stated outcomes.
I have looked over it briefly, and it sounds wonderful; I agree with everything in the vision. I just feel that it is a little bit like CAPS, in that the Government has these amazing visions and we have incredible targets that we hope to meet with regard to climate change, but we are not putting in place the policies to achieve those visions. It is a bit disjointed: there is no cohesion and everything is in silos. We have good visions on individual things, but we do not consider how to implement them and join them up with transport, education and health. That is the problem. The document is great, but there is not enough practical detail on exactly how the vision will be achieved.
The first point that Brian Whittle quoted was about segregated provision on main roads. We believe that that is critical for the future. On interauthority cycle routes—Sheriffhall is a good example, as the route runs from Midlothian to Edinburgh—it is really important to have segregated provision; I believe that I am right in saying that the Conservative manifesto for the Scottish Parliament election included segregated routes in every city in Scotland.
The problem with segregated routes between local authority areas is that—quite understandably—each local authority wants to invest its cycling funding in its area of greatest population, so there is less money for routes between authorities. Some years ago, the regional transport partnerships used to have capital funding, but that was removed by the Government when it first came to power, and as a result there is now a lot less money available for interauthority cycle routes. When SEStran had capital funding, it allocated £4 million for routes between Edinburgh and Midlothian, East Lothian and so on. That was all lost when the capital funding was scrapped.
One project that survived was the A90 cycle route, which goes from Edinburgh to the Forth road bridge and Fife. That was completed about two years ago and has been incredibly successful. I do not have the figures with me, but I am sure that the City of Edinburgh Council could supply them. There has been a major increase in commuting into the city via that route.
As far as Sheriffhall in particular is concerned, SEStran has pointed out that the existing biggest flows of cycling between Edinburgh and the surrounding areas are between Edinburgh and Midlothian, so it is a particularly important corridor.
With regard to Sheriffhall, I know that Midlothian Council is planning on a bit of a cycle highway between the Sheriffhall roundabout and the Tesco Hardengreen roundabout—I do not know whether you know the area—and then between Hardengreen and Eskbank. It is quite a wide road and the council is really keen to segregate it properly. I feel that having provision properly implemented in Sheriffhall could kick-start other really exciting developments to support commuting into Edinburgh. Journeys within Midlothian are really challenging. The Midlothian transport report stated that it is very difficult to get from west to east in Midlothian by public transport so improvements at Sheriffhall would support connecting Midlothian as well.
The committee is aware that some local authorities have adopted active travel action plans. Are you aware of whether that is widespread and do you consider that the Scottish Government should promote those initiatives?
I believe that in the cycling action plan for Scotland there is a very strong request to all local authorities to adopt such plans—I do not know whether it is actually a requirement. Some money and resources—via Cycling Scotland—have been put into assisting local authorities with drawing up plans, so I believe that the process is under way. I am not quite sure what stage it has reached; I am sure that Cycling Scotland could advise on that.
I deal with the Midlothian active travel transport officer quite closely and Midlothian has tiny pockets of money. A lot of them are for soft measures such as cycling days to try to get people out and get their bikes fixed. In fact, the transport officer has said that the focus in Midlothian is on commuting to work by bike. He tries to go along with people to show them the best routes to get to their work and so on. There is a small amount of money, but it is so small that the whole thing basically relies on one person’s single vision and a lot of soft measures.
Some hard measures are about to be implemented; I think that there are, for example, plans along certain parts of the railway. That was a key missed opportunity to implement really good active travel infrastructure. The small pockets of money come every now and again but instead of connecting roads, they just pave an existing path. The problem is that people do not know about the paths. There is a path at Mayfield, by the Shell garage, that is impossible to see. I know that it is there only because the transport officer told me about it.
Some years ago, as the committee will know, there were regional councils rather than the present set-up, so because the councils were much bigger, it was possible to set up expertise within each council on walking and cycling. Lothian Regional Council, for example, had a fantastic cycle team.
When the regional councils were split up, Edinburgh was fine because it is still a fairly large local authority, but Midlothian, West Lothian, and East Lothian all basically lost nearly all their expertise. This is an area in which regional transport authorities could help considerably. I know that SEStran is trying to work on that in order to build up regional expertise and to provide assistance to all the smaller local authorities that just do not have the resources for it. That does not help with the capital funding, but it provides the expertise, which is the other side of the coin.
To follow on from that—you have answered half my question—what involvement has Sustrans had in option B and the other options?
Are you asking about Sustrans as opposed to SEStran? I was talking about SEStran in relation to providing expertise for small local authorities.
Right, okay.
Sustrans has paid a great deal of attention to Sheriffhall roundabout specifically. It did a very detailed assessment of the original options and, as I said in my opening statement, it has said that the option that the Government has chosen as its preferred option is so poor that Sustrans is unwilling to comment on the details and feels that the Government should rethink which option it is going for.
Has Sustrans told the Government that it is unwilling to comment?
Yes. Sustrans has written a letter—it is publicly available—to AECOM, the consultants that the Government has taken on for the design.
That is great.
A key part of your petition is about how the consultation process feeds into the development of infrastructure projects. Do you have any suggestions about how the Scottish Government could achieve a higher standard of public consultation on active travel infrastructure?
The consultation was not the issue; there was a consultation. David French was involved and he said that he was listened to and heard. Sustrans and Spokes have had input—they have been heard and listened to by the Scottish Government. Despite that, priority is given to the STAG model, which sets out what measures will create what amount of journey time saving. If we were to increase cycling by 10 per cent, for example, the model would not look at how that would decrease congestion, what the impacts on the local economy would be or what the CO2 emissions savings would be.
There is nothing wrong with the STAG model, but it must be a lot broader and take into consideration different criteria. It is very narrow. I have a masters degree and I studied environmental assessment methods. There is nowhere near enough of that in the model.
Do you know whether figures about or surveys of active travellers regularly feed into the development of infrastructure projects in Scotland? Do you have any suggestions on how the Scottish Government could source that data? Dave French mentioned sharing details from Sustrans.
I would look to Sustrans to answer that.
Local authorities collect some data, but I am not sure how consistent that is between authorities. Edinburgh has a lot of automatic traffic counters that count cyclists as well as motor traffic, but I do not know the position in local authorities in general.
In academic literature, a plethora of research states something along the lines that the more roads we create, the more traffic there is. There is a direct correlation between the length of a road and the amount of cars that will use that road. There is also clear evidence that providing active travel infrastructure, such as segregated cycle paths, leads to an increase in cycling. Furthermore, there is a lot of literature on the economic benefits of creating active travel infrastructure. People may argue that transport budgets are tight, but the payback is quick.
To follow up on the question of how big decisions are taken, there seems to be a general feeling among designers and decision makers that the big decisions on a project can be taken and walking and cycling can be fitted in afterwards. As I said in my introduction, the big decision often rules out the best option.
By far the best example that I can give you of that is the Edinburgh tramline system. As you will know, a great number of related injuries—250—have been seen at Edinburgh hospitals, and the tramlines have possibly been implicated in a recent death.
A lot of the problems are to do with the tramline layout. We made such points 10 or 12 years ago when the layout was being discussed. We even brought over an expert from the Netherlands, who did a report that showed how the tramline layout could be made much more amenable to walking and cycling. Unfortunately, all that was turned down. As a result, it is much more difficult to implement safe interaction between walking and cycling and the trams. The tramline layout cannot be changed—that would be far too expensive and disruptive.
The consultant who came over said, “What you’re doing is implementing a tram then trying to fit everything around it. If we were doing this in the Netherlands, we wouldn’t be implementing a tram; we would be looking at trams, buses, walking and cycling and how the whole thing fits in for maximum safety and maximum convenience for the whole of society.”
Thank you—that is a helpful example.
We are tight for time, but I promised Christine Grahame that she would get an opportunity to ask questions. I ask her to be alive to the time pressures.
10:45
You loved saying that, convener, as I do in the chamber.
I know the Sheriffhall roundabout like the back of my hand, because I use it regularly on the A7 or the A6106, and I have never seen a cyclist trying to navigate it. As the petitioners and I know, the lights change immediately and, as soon as the lights for the bypass change, the next lane whizzes off. I do not think that I have ever seen a pedestrian trying to navigate the roundabout. I believe that cyclists call it the blender, and I am not surprised.
I am practical about such issues. We have all these models and things such as that, but I am looking at a picture of option B, and, to be frank, the only thing that is proposed is to lift up the bypass; the original roundabout, which as we know has lights that switch rapidly, will be left as it is. That is no use whatsoever to cyclists and pedestrians. The irony is that, as you and I know, although there is a cycle path on the A7 to the north of the roundabout, there is no way of reaching it.
I have asked the minister a couple of times about the issue. I asked whether he would make provision for cyclists, and this is what I got back:
“Suitable provision for all users, including cyclists, is an important part of the proposed improvements to Sheriffhall Roundabout and this will be developed in further detail”.—Written Answers, 15 May 2017; S5W-09136.
I have heard nothing since. My concern is that we will get something planted on that will not work for cyclists.
You talked about graded lanes. Given that something is in train, are you saying that you also require—as you probably do—lights that change for cyclists and pedestrians and which hold the local traffic as well as traffic on the slip roads that go to the bypass east and west, because of the way in which the current light system operates? What is your solution? You are the cyclist, so you know better than anybody else.
Ideally, what everyone wants and what Midlothian was promised is a cycle bridge. Unfortunately, with option B, the bypass goes over the roundabout, so there cannot be a bridge over the bypass.
The situation is difficult. Because the current option is so poor, we are hammering something on to the outside, whereas it should be integrated in the design. I presume that that would be an improvement to the current situation. I would not cycle on the Straiton roundabout either, because it is a nightmare. If we create a system that is still a barrier but has a sort of minor improvement, we will not get people on bikes. We do not need to get cyclists on bikes; we need to get people on bikes who want to have the opportunity. We need to get the lady who works in radiology at Little France on her bike because she feels that the journey will be safe and she will not have to sit in traffic. Brave cyclists such as my husband will do it, but it is the normal people who need support and should be given as much support as possible, which I presume would mean lights. Ideally, the measure would not be tacked on at the end. We want a proper crossing.
If we were to tear up option B, we would still have to deal with the enormous amount of bypass traffic and separate local traffic from it and the traffic that feeds on to the bypass. What would you do instead of having a flyover for the bypass?
Option C.
Yes, option C. In the consultation, I criticised that option for some minor things, but it would be a huge improvement on what is there now and on options A and B, because people could cycle from Dalkeith to Edinburgh without crossing the A720 or the A7.
I consider myself to be a fairly confident and brave cyclist, but I have found cycling round Sheriffhall terrifying. The last time I went there, I took the pavement, and it took me three minutes to go round the roundabout, as I had to stop and wait for a gap in the traffic, which is not always obvious, because drivers do not always indicate when they are coming off the slip roads, and they go terrifyingly fast.
They also switch lanes.
I am a brave and confident cyclist, and I am terrified. We should build infrastructure that people are happy to take an eight-year-old across, that an 80-year-old will be happy cycling across and that people in wheelchairs can go across. We do not have that.
As a final point—I thank the convener, who has been tolerant—will you say what option C was?
Option C involved moving the roundabout half a mile west, using the old roads—the current A7 and A6106—and putting cycle lanes on them, and then building a bridge over the A720 to the east of the new roundabout. It would have been great.
This is a live issue and the minister will be questioned on it, but we need to consider what to do with the petition. I thank the witnesses for the evidence that they have given, which has been useful.
Do members have comments or suggestions for further action? I think that we want to take the petition forward. We have discussed the issue of planning and not bolting things on afterwards, when they become difficult.
I would be interested to hear feedback from the Government on the plan and the reasons why it has gone with option B.
We will contact the Scottish Government.
Can we press it for an answer to Christine Grahame’s question, which she has not had much feedback on?
Yes—the answer just mentioned a general principle and said, “We will make sure they are catered for.” There was no practical detail.
In consultation with the clerks, we can see whether it would be worth while to get the minister in, as opposed to simply dealing with the matter through correspondence.
Are there any other suggestions? Sustrans has been mentioned.
We should write to Sustrans, and we should also get more information on option C, which has been emphasised.
The conclusion section of the clerk’s note for the committee recommends writing to various bodies to seek their views on the petition. May I suggest that you add to that and seek their views on the petition in respect of transport projects in general and specifically the Sheriffhall roundabout? There are two issues—
I appreciate that, but I would need to take advice on whether, as the Public Petitions Committee, we can focus on individual projects. We might be able to ask the minister about the project in that context, but we can check that out. I am sure that the clerks will be happy to advise us.
Given the nature of the petition, we should also contact Scottish Environment LINK, which is the umbrella body for a number of non-governmental organisations, and perhaps WWF, which I know has strong views on the current situation.
We can highlight a number of issues, and we will get back to the petitioner on the direct question about whether we can seek views on the specific as well as the general. Thank you very much for your attendance. I suspend the meeting to allow the witnesses to leave the table.
10:52 Meeting suspended.
10:54 On resuming—
Motions, questions and votes
Linked from this item of the Official ReportIn this meeting
Everything on 29 Jun 2017 →- 09:15 Continued Petition Petitions · 65
- 09:45 New Petitions Petitions · 53
- 10:15 New Petitions Petitions · 57
- 10:45 Continued Petitions Petitions · 1
- 10:45 Continued Petitions Petitions · 7
- 11:00 Continued Petitions Petitions · 7
- 11:00 Continued Petitions Petitions · 18
- 11:00 Continued Petitions Petitions · 5
- 11:00 Continued Petitions Petitions · 4
- 11:15 Continued Petitions Petitions · 6
- 11:15 Continued Petitions Petitions · 22
- 11:15 Continued Petitions Petitions · 10
- 11:30 Continued Petitions Petitions · 6
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.