To ask the Scottish Government how the Forth road bridge closure has affected the condition of roads on diversionary routes. (S4O-05642)
Official Report · Chamber
Portfolio Question Time Infrastructure, Investment and Cities
link
To ask the Scottish Government how the Forth road bridge closure has affected the condition of roads on diversionary routes. (S4O-05642)
Where possible, Transport Scotland kept diverted traffic, including heavy goods vehicles, on the trunk road network to avoid disruption on local roads. For example, we utilised the prearranged standard incident diversion route for the Forth road bridge, using the M9, M876, A876 and A985.
To keep the diversion route running freely, Transport Scotland completed additional pavement inspections during the bridge closure. Any perceived accelerated deterioration will be taken into account when planned remedial works and reconstruction schemes for those routes are decided in the coming months and years.
The maintenance and management of local roads is the responsibility of the relevant local authorities. The Scottish Government greatly appreciates their efforts during the closure period.
link
Can the minister tell me whether the assessment of the trunk road network has flagged up any issues related to the higher than normal volume of traffic, especially during the extended period when HGVs were using the routes? Have local authorities made any claims in relation to additional damage to the road networks that they are responsible for? Does the minister have an indication of the cost to central and local government of the diversions that were in place?
I assume that the question is really about the condition of the carriageways. I do not have that level of detail on accelerated deterioration, but the general wear and tear would have increased as the roads were potentially more heavily used by HGVs.
I am not aware of any detailed claim from a local authority, but there has been engagement with the business sector, local authorities, communities and others following the issues around the Forth road bridge. As regards future investment decisions, as I said earlier, roads are inspected and remedial works and reconstruction are programmed on the basis of need. It is on that basis that we will proceed.
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.