Because the weakest parts that we had identified were the welds within the truss end links and we were carrying out close inspection of those. There are components of the bridge that need to be replaced before the life of the structure comes to an end, and the truss end links are part of that family of components. They were reaching the age of 50 years, so we felt that they had to be replaced.
Official Report · Committee
Forth Road Bridge Closure
Speakers
Choose an MSP to read only their contributions- Barry Colford Former Chief Engineer and Bridgemaster, Forth Estuary Transport Authority 75
- Jim Eadie SNP 48
- Councillor Hinds 26
- Adam Ingram SNP 20
- David Stewart Lab 20
- Alex Johnstone Con 15
- Phil Wheeler Former Convener, Forth Estuary Transport Authority 13
- Councillor Chisholm 11
- Clare Adamson SNP 9
- Mike MacKenzie SNP 4
- Chris Tracey Former Engineering Services Manager, Forth Estuary Transport Authority 2
- Councillor Lesley Hinds Former Convener, Forth Estuary Transport Authority 1
- Councillor Ian Chisholm Former Board Member, Forth Estuary Transport Authority 1
The record
245 contributions · showing 201–245You also pointed out that it was extremely difficult to inspect the pins.
Yes.
Would that not also indicate a need for structural health monitoring of the pins?
At the time, we did not feel that there were any issues with the pins.
Yes, but you pointed out in answer to an earlier question from me that there were issues with the pins in the Humber bridge.
There were.
I assume that there are also issues with the pins in other suspension bridges around the world. Surely that should have flagged up that there was perhaps a need to investigate the issue.
The pins at Humber displayed signs of wear and signs of distress, so they were replaced. I am not sure that much permanent monitoring was done at Humber.
We were aware that we could not inspect the pin and we could not grease it, but we carried out an inspection of the areas adjacent to the pin. As I understand it, the pin itself has not failed.
It has seized.
As I understand it, it is the members adjacent to it that have failed, although, as I said, I have not been involved in the analysis.
I come back to the point about—
This is supposed to be a brief supplementary question.
Sorry, convener. It is on the point about structural health monitoring. Clearly, you cannot do that on every part of the bridge, but surely it should be done on the parts of the bridge that you have concerns about and which might alter your prioritisation for capital programmes. Why was that not done?
You have to consider the risk, what is involved in it and whether you should spend money, time and resource examining a particular member or another one. The risk priority was members that might cause structural collapse and the one that we are talking about was not one of those. The failure of that member would have caused an operational issue, not collapse.
In hindsight, would it have helped to determine the possibility of something being done sooner if structural health monitoring had been in place to identify the problem?
With the benefit of hindsight would I—I am sorry, but what was the second part of your question?
If structural health monitoring had been in place, would it have flagged up the fact that there was an issue with the pin that needed to be addressed?
Yes, possibly.
Is it fair to say that that would not have been a cheap option?
It would have been difficult to do and I assume that it would have been expensive.
You might consider monitoring, but one of the reasons why we wanted the bridgemaster and the senior team to remain in place was their experience. They knew the bridge like the backs of their hands, and that level of expertise is one of the reasons why the FETA board was keen to keep them in place. We wanted to ensure that, when we handed the bridge over, that expertise, knowledge and experience of the bridge would be in place. That is crucial as well.
I have a question about the antithesis of structural health monitoring, which is the way it has aye been done. Early in the process, the minister, who had been advised by his engineers, told me that, if the truss end links work had been done, the problem would have been avoided but that would have been a by-product—it would have been a bit of a lucky break that the work had been done without the issue having been discovered. Is that not, to an extent, fundamentally to misunderstand the nature of maintenance of old machinery, in that, when you take things apart and put them back together again, you invariably discover things that you did not know were there and you replace parts as you go along? Is failure to deal with the issues not also a risk factor for being caught out, as we were?
That is difficult to answer.
It was not meant to be an easy question.
I am not actually sure what the question was. It sounded like more of a statement than a question.
We had identified a need to replace the truss end links. We felt that it was a serious issue when we first discovered the overstress in the welding, but we considered it from an engineering point of view. The links were getting on for 50 years old. They were one element of the bridge that we considered for replacement and put in our capital programme for replacement. The decision to do that was made in 2010 or 2011, but it was one of a number of issues on the bridge that had to be dealt with. Our focus at the time was on the main cable anchorages and the main cable. Five years on, it is difficult to remember how intense that period was for dealing with the main cable and main cable anchorages. We had real concerns about those at the time.
I will add a wee bit from my own life experience. Preventive maintenance often causes more problems than it purports to solve. If you take your car into the garage, many times it comes back with more problems than it went in with.
It depends on your mechanic.
It does. It is a difference in philosophy. Many people say that you should just not to go into preventive maintenance.
I do not know of any sensor that would monitor the seizing up of that bearing on the truss end links. How could that be done? It might show up under visual inspection, but it is difficult. As I said right at the beginning, you could do it using ultrasonics or X-ray technology, but permanent monitoring of those components would be difficult in practice. As Barry Colford said, which component on such a complex structure do you decide to monitor? I might add that the structure is more like a ship than a road bridge. It is in a marine environment and so has all the problems of marine environments, such as salt water ingress. They all have an impact and were probably a factor in the bearing seizing up.
The bridge is not easy to look after, but we have kept it going. She is getting to be an elderly lady. Funding will have to be supplied for the next 50 to 100 years because, as far as I know, the bridge is a listed building. Somebody has got to commit to funding the bridge in future despite it having a much lower loading. It will still need to be looked after because of the environment that it lives in.
Thank you. Do members have any final questions?
link
Mr Colford, earlier you said that, had the truss end link project gone ahead—I appreciate that it was not scoped and the full technical specification had not been done—it would have resulted in considerable disruption. What would that disruption have been and how long would it have lasted?
At the time, we knew that we had an engineering solution and we could do the work. We had got to the point at which we knew that it could be done. The next stage would have been to advertise for a consulting engineer to design it. The consulting engineer would have put together a design and we would have got a contractor on board to carry out the work. That is when the determination of disruption would have been done.
We knew at that point that there was likely to be some disruption to users. As we know, closing a lane of the Forth road bridge for four hours causes significant disruption to users. At that point during the feasibility study, it would have been difficult to say that there would be no disruption to users. That would have been possible only when we got the contractor on board and knew its method of working and where the balance would be between carriageway closures and cost of the works. The cheapest way of doing it would have been to shut the bridge and allow the contractor to get on with it. That is one extreme, and we could not have done that. The other way would have been to minimise the number of closures, which is what we would have done, but the cost would then have gone up because the contractor would have had to work difficult hours.
It is difficult to say what the disruption would have been, because we did not reach that stage; it would have come quite a bit later. However, we would have been telling people to expect disruption. In my experience on the bridge, when we resurfaced a carriageway during weekends, we would carry out a huge publicity campaign to tell people to stay away, but it did not work as well as we would liked. Human nature being what it is, people still came and expected that their neighbour would not go so they would be okay.
It is difficult to do all that and there is a balance to be struck. If we had carried out the works ourselves, there would likely have been major disruption. The work would have been planned and advertised, but my experience has shown me that there would still have been disruption.
As there are no further questions, I ask the witnesses whether they have any final comments. I am conscious that you have not contributed, Mr Tracey.
I am consciously keeping quiet. Laughter.
It is okay; he used to do that at board meetings as well.
Barry Colford has covered most of the issues as far as I am concerned, although I might reiterate a couple of things. The capital plan was based on our programme of inspections, on structural assessments and on operational needs. That was how we established the plan in the first place. Bridge managers, or asset managers in general, use asset management and work prioritisation every day throughout the UK, and around the world, for that matter. Following assessment and inspections, we go through and prioritise schemes. We have to prioritise them because there is not an infinite budget available for us to carry out all the work on all the assets throughout the country. The process that we went through was no different from what happens on a daily basis throughout the country.
12:00
I knew that it would be worth having you here. Do witnesses have any final comments to place on the record?
The discussion has been interesting and the questions have been very detailed and have helped me to focus—flattery will get you everywhere. In my opening statement, I talked about the three significant decisions that were taken outwith FETA and the board and about the professionalism that was shown. FETA’s reputation is really important to me and I hope that the evidence that we have given today as a board has proved that.
The only time that the board had a vote when I was convener was when we were asked to put a certain flag on the bridge.
It was not the skull and crossbones, was it?
I think that you know what the flag was.
You probably know which way the vote went, too.
We will not go there.
We try to operate the committee on the basis of consensus.
Exactly. I hope that the answers that we have given to your questions have proved that the FETA board and the professional body left the bridge in a good condition.
Thank you. It only remains for me to thank all our witnesses for their attendance this morning and for their openness and willingness to engage with the committee in such a constructive way. We also appreciate the detailed documentation that you sent to the committee. It was invaluable for our deliberations. Thank you, once again.
Thank you to Mr Colford; we recognise that your commute today was slightly longer than that for the rest of us.
12:02 Meeting continued in private until 12:23.
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.